Dormakaba BTS75V/E Installation Instructions Manual
Dormakaba BTS75V/E Installation Instructions Manual

Dormakaba BTS75V/E Installation Instructions Manual

Package e & f 20 minute-rated and 3-hour rated 3/4” offset hung, single acting

Advertisement

Quick Links

BTS75V/E,F, 75V BF/E,F, 80/E,F
Package E & F
20 minute-rated and 3-hour rated
3/4" offset hung, single acting
Installation instructions
08076345 – 02-2021
| EN |

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BTS75V/E and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dormakaba BTS75V/E

  • Page 1 BTS75V/E,F, 75V BF/E,F, 80/E,F Package E & F 20 minute-rated and 3-hour rated 3/4” offset hung, single acting Installation instructions 08076345 – 02-2021 | EN |...
  • Page 2: Table Of Contents

    BTS75V/E,F, 75V BF/E,F, 80/E,F Table of Contents Installation Instructions Table of contents Installation Attach spindle and install closer Install top pivot Install bottom arm in bottom of door (75323) Install the door Templates Top pivot template Bottom arm (75323) template...
  • Page 3: Installation

    BTS75V/E,F, 75V BF/E,F, 80/E,F Spindle and closer Installation Instructions Pivot Pivot channel Installation 1.1 Attach spindle and install closer Fig.1 Spindle screw 1.1.1 Slide washer over tapered square end of spindle until Spindle fully seated in groove. 1.1.2 Fasten spindle with spindle screw provided.
  • Page 4: Install The Door

    BTS75V/E,F, 75V BF/E,F, 80/E,F Install door Installation Instructions 1.4 Install the door Fig.4 1.4.1 With door parallel to frame, place bottom arm onto closer spindle. 1.4.2 Align door and frame portions of top pivot. 1.4.3 Install pivot pin, set screw and cover cap.
  • Page 5: Templates

    BTS75V/E,F, 75V BF/E,F, 80/E,F Templates Installation Instructions Templates 2.1 Top pivot template Fig.5 4-1/4” 4-1/4” [108] [108] 1-5/32” 1-5/32” Door Leaf [29] [29] Frame Leaf 25/64” 25/64” 1-5/32” 1-5/32” [10] [10] [29] [29] 1/16” 1-5/32” 1-5/32” 11/32” Min. 11/32”...
  • Page 6: Bottom Arm (75323) Template

    BTS75V/E,F, 75V BF/E,F, 80/E,F Templates Installation Instructions 2.2 Bottom arm (75323) template Fig.6 Front view 5/8” [16] Finished floor 3/4” For 1/4-20 machine screws use No.7 drill. [19] For No.14 wood screws use 5/32” drill. 3/4” Four (4) holes in door.
  • Page 7: Cement Case Template

    BTS75V/E,F, 75V BF/E,F, 80/E,F Templates Installation Instructions 2.3 Cement case template Fig.7 clearance 1/16” 5/8” 1/8” inset minimum [16] Top view door 3/4” Cement case [19] 3/4” flush door [19] and frame 13/16” [21] 2-1/8” ± 1/8” [54 ± 3] BTS80 - 13-7/16”...
  • Page 8: Adjustments

    BTS75V/E,F, 75V BF/E,F, 80/E,F Adjustments: clearances Installation Instructions Adjustments: closing speeds Adjustments 3.1 Adjust bottom door clearances (if necessary) Fig.8 3.1.1 Closer can be raised approximately 5/32” with the cement case. 3.1.2 Loosen fastening screws “A”. 3.1.3 Turn height adjustment screws “B”...
  • Page 9: Adjust Spring Tension (If Necessary)

    BTS75V/E,F, 75V BF/E,F, 80/E,F Adjustments: spring tension Installation Instructions Sealing compound Covers 3.3 Adjust spring tension (if necessary) Fig.10 BTS75VBF Adjust only if more spring tension is required to positively close and latch the door. Depending on opening conditions, a door adjusted to meet...
  • Page 10 DORMA USA, Inc. T: 800-523-8483 www.dormakaba.us...

This manual is also suitable for:

Bts75v/fBts75v bf/eBts75v bf/fBts80/eBts80/f

Table of Contents