Jessie
Rail System
Installation Guide
Rail Top
Bar Top
Included components:
Rail Top
Surface
Embed
Mount
Cover plate halves
Rail Top
Surface
Surface
Mount ‐
Mount ‐
Embed ‐
Intermediate
End
End
Bar Top
Rail Top
Bar Top
End Cap
#6‐32 x 3/8
5/16‐18 x 3/4
Socket button
set screw
Head screw for
for infills
cover plates
Mesh Infill
Embed ‐
Intermediate
Bar Top End Caps
ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish. To protect
this finish during assembly, place unwrapped powdercoated parts on packaging foam or other non‐
marring surface. Do not place or slide powdercoated parts on concrete or other hard or textured
surface – this will damage the finish causing rust to occur. Use touch‐up paint on any gouges in the
finish caused by assembly tools.
Tools Required
• Safety glasses
• 5/32 hex key
For Surface Mount option:
• Anchoring hardware, 4 bolts required per support post. Maximum 3/8" diameter. Non‐
corrosive recommended. Height above surface mount plate cannot exceed 3/8" for cover
plate to install properly.
• Hammer drill with masonry bits
• 5/64 hex key for cover plate assembly
INSTALLATION:
1.
Determine proper support locations based on site specifications. If unit is to be
installed with a backrest or mesh infill, locate supports according to tapped hole
locations. The backrest is intended to be utilized on the side opposite of the access
side for the leaning rail. See Fig. 1 and Fig. 2.
Rail Top
2.
Prepare proper footings or slab/sidewalk as required.
splice lock
SURFACE MOUNT:
1.
Set end post in place. See Fig. 3 and Fig. 4 for minimum slab sizes.
2.
Mark holes. Move unit to drill holes.
3.
Clear holes of debris.
1/4‐20 x 3/4
4.
Install anchors according to anchor manufacturer's recommendations.
socket button
5.
Set the next post in the same manner. Posts are spaced 48" on center.
head screw
EMBEDDED:
1.
Set the end post in place. Brace unit until concrete has set. See Fig. 5 for minimum
pier footing recommendations.
2.
Set the next post in place. Posts are spaced 48" on center.
RAIL INSTALLATION:
1/4" washer
1.
After first two posts in the run are installed, install the top extrusion. Insert the splice
locks into the ends of the extrusions and then attach to the support posts. See Fig 6.
2.
Install the end cap. See Fig. 6.
3.
Continue installing the run, working in sections. Install the next post and top
extrusion, ending the run by installing the end cap.
Backrest
INFILL INSTALLATION:
1.
The backrest or mesh infill can be installed after the rail system is in place.
2.
See Fig. 7 for orientation of the backrest.
COVER PLATE INSTALLATION:
1. Install cover plates as shown in Fig. 8.
Date: May 16, 2017
www.landscapeforms.com
Ph: 800.521.2546
Page 1 of 2
Need help?
Do you have a question about the Jessie and is the answer not in the manual?
Questions and answers