Page 1
Installation instructions DMZ169 Bayonet-anchor tube to be embedded in concrete for type MEZZO, DACAPO and FILIUS The following instructions include all information necessary for the installation and operation of this anchor tube. To avoid any misunderstanding, we advise you to read these instructions carefully and then keep them for later reference.
Page 2
The DMZ169 enables assembly and disassembly of your MAY parasol without any tools. FILIUS including DMZ169 comes to a weight of approximately 20 kg. The DMZ169 provides a solution for pedestrian areas that require quick disassembly to protect the parasol from vandalism or theft at nights.
Page 3
Allow sufficient space between parasols or between the wall of the house and the parasol. Parasols that are located too close together wear sooner. Parasols may sway slightly. If there is not enough space between them, they may touch and abrade or scour the canopy fabric at the spoke ends.
Page 4
Keep to the dimensions specified above. In case of poor-quality ground, opt for a larger-size foundation. The concrete foundation can be damaged by frost. Temperatures below freezing point may have a negative impact on the concrete foundation. Caution ...
Page 5
3. Spread gravel on the bottom of the foundation, thereby allowing enough space for a recess or a drainage pipe at the end of the ground tube so that rainwater can drain off. position of recess or drainage pipe, e.g. PE 56 seepage layer round gravel 16-32 4.
Page 6
7. To assure that the top plate is flush with the ground after the anchor tube has been removed, (cf. illus. b) insert the ground tube 4 mm deeper into the concrete than the patio surface (cf. illus. a: -to give a clearer picture, the anchor tube has been omitted). In this way tripping hazard is eliminated.
Page 7
Foundation formwork and reinforcement plan ground plan cross section A – A foundation layer gravel bed Mounting and securing of parasol in central position. Reinforcement to be placed to suit the anchorage. 1. The allowable footing pressure must be 200 kN/m². This must be certified in a geotechnical report by an expert soil surveyor.
Page 8
2. Bar details – bending shape: quantity length dimensioned total weight diameter each bending shape length [pieces] [mm] [kg] 1.09 8.72 3.44 1.31 15.72 6.21 0.24 total weight ∑ 10,53 kg 3. Minimum values for bar bending roll diameter dBr for reinforcing steel B500B according to DIN EN 1992 -1-1/NA: 2011-01 Chart NA.8.1.
Need help?
Do you have a question about the DMZ169 and is the answer not in the manual?
Questions and answers