MAY SZ131 Installation Instructions Manual

MAY SZ131 Installation Instructions Manual

Dowel-anchored plate with placement hinge for type schattello

Advertisement

Quick Links

Installation instructions SZ131
Dowel-anchored plate with placement hinge for type SCHATTELLO
The following instructions include all information necessary for the installation and operation of
this dowel-anchored plate. To avoid any misunderstanding we advise you to read these
instructions carefully and then keep them for later reference.
Non- observation of operating instructions can result in personal
injuries or damage to property.
Please note that if these instructions are not observed, the manufacturer cannot
Caution
assume any liability or guarantee.
Always follow the safety regulations.
Should you not understand any part of these operating instructions, please
contact your MAY dealer.
Installation diagram
hex socket head screw M10x25mm
hex nut, M10
hex socket head screw 16x30mm
+ 16mm washers
dowel-anchored plate
Stand 36-1824
English
bore hole for theft and
anti-twisting lock
placement hinge
page 1 of 7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SZ131 and is the answer not in the manual?

Questions and answers

Summary of Contents for MAY SZ131

  • Page 1 Installation instructions SZ131 Dowel-anchored plate with placement hinge for type SCHATTELLO The following instructions include all information necessary for the installation and operation of this dowel-anchored plate. To avoid any misunderstanding we advise you to read these instructions carefully and then keep them for later reference.
  • Page 2 1. Allow sufficient space between sunshades or between the wall of the building and the sunshade. Sunshades that are located too close together wear sooner. Sunshades may sway slightly. If there is not enough space between them, they may touch and abrade or scrape the canopy fabric at the spoke ends. Caution ...
  • Page 3  In case of poor-quality ground (Soil classification 4 or less), opt for a larger- size foundation. The concrete foundation can be damaged by frost. Temperatures below freezing point may have a negative impact on the concrete foundation. Caution  Inquire up to what depth the ground of the designated sunshade location is frost-proof and choose the size of the concrete foundation accordingly.
  • Page 4  Always determine the appropriate bolt size with the help of a specialist.  Anchor bolts of May company are approved for cracked and non- cracked concrete C20/25 to C50/60. Also suitable for concrete C12/15 and natural stone with dense structure.
  • Page 5 If the sunshade is to be in a vertical position, the anchor plate must be dowel-fastened absolutely vertically. It may be necessary to align the anchor tube with the help of washers. Caution apply the spirit level on two sides 90°...
  • Page 6 1. Fold down the upper anchor tube. Disconnect the underground cable from the cable in the sunshade pole. Lift the sunshade out of the anchor foot. Electric installation work should be carried out solely by a certified electrician. Disregarding this warning may result in serious personal injuries. Gefahr ...
  • Page 7 The thread can get damaged. When the top plate is not on the lower anchor tube, sand may get washed into the flanks of the thread. As sand is harder than steel, the thread may get Caution damaged when the screw is turned.

Table of Contents