Rice Lake DeckHand DH-500 Installation And Service Manual
Rice Lake DeckHand DH-500 Installation And Service Manual

Rice Lake DeckHand DH-500 Installation And Service Manual

Portable floor scales
Hide thumbs Also See for DeckHand DH-500:

Advertisement

Quick Links

DeckHand
TM
Portable Floor Scale
Installation and
Service Manual
AM-5218
CC# 97-034
43978

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DeckHand DH-500 and is the answer not in the manual?

Questions and answers

Summary of Contents for Rice Lake DeckHand DH-500

  • Page 1 DeckHand Portable Floor Scale Installation and Service Manual AM-5218 CC# 97-034 43978...
  • Page 2: Table Of Contents

    3.6 Ramps and Replacement Load Cells ..................7 4.0 Replacement Parts ....................... 8 5.0 DeckHand Limited Warranty ..................10 Copyright © 1998 Rice Lake Weighing Systems. All rights reserved. Printed in the United States of America. Specifications subject to change without notice. February, 1998...
  • Page 3: Introduction

    “clamshell” load cell guards and indicator brackets junction box on the mast. The mast must be inserted for any Rice Lake IQ series indicator. Other indicators into the scale base and bolted into place. The indicator can be readily mast-mounted with slight modifications.
  • Page 4: Assembling Mast To Base

    2.2 Assembling Mast to Base 2.4 Mounting and Wiring an Indicator Place scale base with platform on a level surface. Lay 2.4.1 Attaching Indicator Bracket to Mast mast on floor nearby with base of mast adjacent to mast The DeckHand is supplied with a swivel bracket for an cutout in the base frame.
  • Page 5: Corner Trimming

    2.5 Corner Trimming up the indicator so it can warm up for at least 20 minutes before starting calibration. The DeckHand scales are factory-trimmed so each load cell shares an equal part of the weight load. The scale should be “exercised” before calibration to be certain that everything is seated.
  • Page 6: Service Information

    3.0 Service Information When cleaning beneath the platform, be careful not to move the load cell cables to a new position where they can be pinched by the platform in operation. 3.1 Troubleshooting Guide Caution System does not operate—no display Do not attempt to spray wash scales with non-hermetically •...
  • Page 7: Wiring Load Cells Into J-Box

    comfortable access to the load cell screws from is wired to terminal 4 of the J-box, and the right load underneath the base. Position the new load cell with cell is wired to terminal 1. Note that the wire traces for the cable to the inside and the label readable from the cells 2 and 3 (JU-2, JU-3 ) have been cut, making those outside.
  • Page 8: Installing Protective Clamshells

    box trimmed, but re-trimming to equalize loading is tive, so adjusting the higher output may affect necessary after replacing a load cell. the reference cell output. To trim the scale, the output from each load cell must 6. Secure extra cable length by wrapping it around be matched by adjusting the signals with potentiometers the cable storage pegs inside the mast.
  • Page 9: Mounting Indicator Brackets

    Optional Indicator Mounts screws to original torque specifications (20 ft. lb. for mild steel screws, 12 ft. lb. for stainless steel Part # Description Size screws) ® 41315 IQ plus 310A mount, painted steel 4" x 7.5" 4. Position top spacer blocks on load cells, then set ®...
  • Page 10: Replacement Parts

    4.0 Replacement Parts...
  • Page 11 PART NO. PART N0. REF. DESCRIPTION MILD STEEL STAINLESS Cable, 6-Conductor, 3 1/2 ft ............44187 ....44187 Mount, Indicator, 310A ..............41315 ....41316 Grommet, Rubber 1/2 x 1/4............. 15398 ....15398 Flat Washer, 1/4 ................15145 ....15149 Cap Screw, 1/4-20NC x 3/4 ............
  • Page 12: Deckhand Limited Warranty

    5.0 DeckHand Limited Warranty Rice Lake Weighing Systems (RLWS) warrants that all RLWS equipment and systems properly installed by a Distributor or Original Equipment Manufacturer (OEM) will operate per written specifications as confirmed by the Distributor/OEM and accepted by RLWS. All systems and components are warranted against defects in materials and workmanship for one year.

Table of Contents