Summary of Contents for Generac Power Systems PROTECTOR RG048
Page 1
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 2
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 3
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 4
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 5
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 6
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 7
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 8
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 9
Catalog Number: Type: Submitted by NW Electrical Job Name: RG04845JNAX Self-Reliance Credit Union Notes: Current lead time prox 15-16 weeks NWES24-21067 Index Page...
Page 10
Catalog Number: Type: Submitted by NW Electrical Job Name: RTSW200J3 Self-Reliance Credit Union Notes: Current lead time prox 2-3 weeks ARO NWES24-21067 ® Automatic Service rated Automatic Transfer Switches Transfer Switches 1 of 2 100 - 200 Amps, Three Phase DESCRIPTION Generac Three Phase Automatic Transfer Switches are designed for use with three phase generators that utilize an Evolution™...
Page 12
Catalog Number: Type: Submitted by NW Electrical Job Name: SX27F-EX Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 EXIDE SPRINTER MAX AUTOMOTIVE GROUP 27F SX27F-EX BATTERY SKU # SX27F-EX More Information Cold Cranking Amps rating at -18°C (0°F) SX27F-EX Reserve Capacity Manufacturer...
Page 13
Catalog Number: Type: Submitted by NW Electrical Job Name: 7991 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Model: 7991 4.5L; 48kW Scheduled Maintenance Kit Liquid-cooled scheduled maintenance kits offer all the components necessary to perform complete maintenance on Generac liquid-cooled generators.
Page 14
Catalog Number: Type: Submitted by NW Electrical Job Name: 7990 Self-Reliance Credit Union Notes: Usual lead time prox 4-5 weeks ARO NWES24-21067 Model: 7990 48kW, 60kW, 80kW 4.5L Extreme Cold Weather Kit Block heater kit. Recommended if the temperature falls below 32 degrees Fahrenheit (0 degrees Celsius) for extended periods of time.
Page 15
Catalog Number: Type: Submitted by NW Electrical Job Name: 6510 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Model: 6510 Emergency Stop Kit (Liquid Cooled Units ONLY) non-4.5L engines E-stop allows for immediate fuel shutoff and generator shutdown in the event of an emergency.
Page 16
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 ® Mobile Link Wi-Fi/Ethernet Remote Monitoring Installation and User Manual Mobile Link Customer Support http://support.mobilelinkgen.com US: 1-855-436-8439 Canada: 1-844-843-9436 Para español , visita: http://www.generac.com/service-support/product-support-lookup Pour le français, visiter :...
Page 17
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Record the information found on the unit data label on this page. Generator Always supply the complete model and serial Model: numbers of the unit when contacting an Inde- pendent Authorized Service Dealer (IASD)
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Table of Contents Section 1: Safety Rules Section 5: Registration Introduction ........1 Section 6: Mobile Link Cellular Antenna Statement ......1 Read This Manual Thoroughly ....1 Mobile Link Setup App....
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Safety Rules Section 1: Safety Rules Introduction SAVE THESE INSTRUCTIONS for future ref- erence. This manual contains important Thank you for purchasing this home standby instructions that must be followed during generator product accessory.
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Safety Rules General Safety connect positive (+) battery cable first, and then negative () battery cable. Electrical Hazards General Safety Hazards For safety reasons, the manufacturer ...
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Safety Rules locked before operating the generator. If work must be done around an operating unit, stand on an insulated, dry surface to reduce potential shock hazard.
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 General Information and Setup Section 2: General Information and Setup Introduction Wire Harness Part Numbers This section of the manual describes the fea- 10000038669 Mobile Link Accessory to tures and controls of the Mobile Link Wi-Fi/...
Page 23
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 General Information and Setup 009154 Figure 2-1. Mobile Link Information Screen 002726b Figure 2-2. Mobile Link App Interface ®...
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 General Information and Setup Setup If the Wi-Fi signal is weak and the network cannot be upgraded, the homeowner Before installing the Mobile Link device, should consider using the Ethernet connec- perform the...
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Getting Connected Section 3: Getting Connected Connecting to Wi-Fi Networks Connecting to New Wi-Fi Network Install the Mobile Link Wi-Fi/Ethernet accessory.
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Installation and Operation Section 4: Installation and Operation Mobile Link Kit Numbers 2. See Figure 4-2. Use arrow keys to toggle between Yes...
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Installation and Operation Preparing Generator (New Installations) 1. Unlock both locks, open generator lid, and remove front panel. 2.
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Installation and Operation Preparing Generator (Equipped with Connecting New Mobile Link Unit Existing Mobile Link Unit) 1. See Figure 4-7.
Page 29
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Installation and Operation 5. See Figure 4-8. With connector installed, tighten plastic fitting to secure Wi-Fi/Ether- net unit until tight and device is secured to end panel.
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Installation and Operation Complete Unit Installation (New and Ret- rofit) 1. Install end panel, controller, or sheet metal controller cover.
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Registration Section 5: Registration Once the Mobile Link Wi-Fi/Ethernet device Enter requested information when prompt- has been installed, it should be registered and ed, then click Sign Up....
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Mobile Link Cellular App Section 6: Mobile Link Cellular App Mobile Link Setup App Download the Mobile Link Cellular for Genera- tors app: Mobile Link Setup...
Page 33
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Mobile Link Cellular App This page intentionally left blank. ® Installation and Users Manual for Mobile Link Index Page...
Page 34
Catalog Number: Type: Submitted by NW Electrical Job Name: 7170 Self-Reliance Credit Union Notes: Usual lead time prox 2-3 weeks ARO NWES24-21067 Index Page...
Page 35
Generac Power Systems, Inc. All rights reserved S45 W29290 Hwy. 59 Specifications are subject to change without notice. Waukesha, WI 53189 No reproduction allowed in any form without prior 1-888-GENERAC (1-888-436-3722) written consent from Generac Power Systems, Inc. www.generac.com Index Page...
Page 36
Catalog Number: Type: Submitted by NW Electrical Job Name: 6478 Self-Reliance Credit Union Notes: Usual lead time prox 2- 3 weeks ARO NWES24-21067 Model: 6478 Mobile Link™: Liquid-Cooled Wired Extending Adapting Harness To utilize Mobile Link with liquid-cooled automatic standby generators, a Harness adapter kit, is recommended for use with liquid-cooled units up to 60kW and required for generators 70-150kW.
Page 37
Catalog Number: Type: Submitted by NW Electrical Job Name: A0000516140 Self-Reliance Credit Union Notes: Current lead time prox 3-4 weeks ARO NWES24-21067 Generac A0000516140 GenPad For RG04845 Liquid Cooled Generator, 90 x 41 x 4 in GenPad LC’s unique Fiber Reinforced Concrete delivers 8000 PSI compression strength. •...
Need help?
Do you have a question about the PROTECTOR RG048 and is the answer not in the manual?
Questions and answers