Submitted by NW Electrical
Job Name:
Self-Reliance Credit Union
Installation and Operation
Complete Unit Installation (New and Ret-
rofit)
1. Install end panel, controller, or sheet metal
controller cover. Install and tighten retain-
ing fasteners.
2. Verify generator is OFF.
3. Install generator controller fuse.
4. Install T1 fuse into transfer switch using an
appropriate fuse puller.
5. Turn main breaker in the home electrical
panel to ON. On generator control panel,
follow installation wizard and validate cor-
rect date, time, etc.
6. Place generator in AUTO.
12
Catalog Number:
7170
Notes: Usual lead time prox 2-3 weeks ARO
Installation and Users Manual for Mobile Link
Type:
--
NWES24-21067
®
Index Page
Need help?
Do you have a question about the PROTECTOR RG048 and is the answer not in the manual?
Questions and answers