SolaX Power X1-Matebox Quick Installation Manual
SolaX Power X1-Matebox Quick Installation Manual

SolaX Power X1-Matebox Quick Installation Manual

Advertisement

Quick Links

Quick Installation Guide
1. Introduction
X1-Hybrid G4
Grid
Off-grid
Main Breaker
X1-Matebox
N
Battery
Distribution Box
Loads
2. Overview
533mm
Object
Name
Description
A
Off-grid1
Off-grid1output portof the inverter
B
Grid1
Grid1 output portof the inverter
C
D
Load
Load connection port
Battery connection port(tobatterypack)
E
Reserved
F
G
Off-grid 2
Reserved
H
Grid 2
Reserved
I
Gridconnection port (to local grid)
J
Grid
K
L
Battery connection port of the inverter
M
3. Preparation
3.1 Check Packing List
Bracket B *1
Bracket A *1
Bracket C *1
Earthing conductor
*1
3.2 Tools
Diagonal Plier
Philips Screwdriver
Slotted Screwdriver
Hexagon keys
Crimping Tool
4. Mounting
X1-Matebox
Matebox
Grid
X1-Hybrid G4
Off-grid
Grid
Main Breaker
X1-Matebox
Grid
Battery
Loads
185mm
A B C
G H I J
M
(Expansion bolt ,
Gasket ,Self-tapping
bolt) *2
Flange nut *4
Crimping Plier
Monkey Wrench
Φ10 Drill
Marker Pen
Rubber hammer
Inverter bracket
Bracket B
Bracket A
Bracket C
Battery bracket
1)
Step 1: Screw the wall bracket on the wall
First splice the inverter bracket, bracket A, bracket B, and battery bracket according to the steps, and
then fasten them to the wall.
Fix the inverter bracket on the support B;
Then set the bracket C on the bracket A ;
Load
Step 3: Mounting bracket A
The mounting method of the X1-Matebox bracket is as follows:
a) Use the bracket as a template to mark the two holes
on the wall with a marker pen.
N
Grid
Distribution Box
c) Insert expansion bolt into the hole, use rubber hammer
to knock the expansion screw bolt into the wall.
D E F
Rubber hammer
Torque :2.5±0.2N·m
K
L
Step 4: Finally install the X1-Hybrid G4 inverter bracket (please refer to the
X1-Hybrid G4 inverter quick installation guide).
Step 5. Install the X1-Matebox on the wall and lock the screws.
Use a level first to ensure that the brackets (battery bracket, bracket A, bracket B, bracket C, inverter
bracket) in the system are firmly installed and level. Then follow the steps below to hang X1-Matebox.
a)Before install the inverter, connectthe ground
wire firstly, and remove the "DONGLE" waterproof
cover (for the installation of communication
accessories); Please refer to the pocket dongle
( WiFi) quickinstallation guide.
X1-Hybrid G4 inverter
C) Open the X1-Matebox buckle, remove the cover, and take out the front protective cover.
5. Monitor the antenna connections of accessories
There is an antenna in the box of monitoring accessories.
a) First open the upper cover of X1-Matebox and remove the baffle; (open the button by hand,
open the cover and slide upwards, and remove the isolation plate)
a)
b) Install the antenna on bracket A and tighten it by hand;
Inverter bracket
c)Then connect the antenna cable to the end of the pocket WiFi.
b)
Bracket B
Bracket A
200.00mm
c)
2)
Inverter bracket
Monkey Wrench
Bracket B
Torque: 1.5±0.2N·m
Bracket A
Monkey Wrench
Bracket C
Torque: 1.5±0.2N·m
Battery bracket
b) Drill holes at marked spots with depth of 80mm.
a)
d ) The bracket is aligned with the screw uses the
inner hexagonal wrench to screw the tapping screw
until the expansion bolt "bang" is heard.
Expansion
bolts
c)
b) Firstly install the battery and inverter on the wall,
and then install the X1-Matebox on the wall;
Then set the bracket B on the bracket A and fix it
with screws;
Monkey Wrench
Torque: 1.5±0.2N·m
Then the bracket C is fixed on the battery
bracket and the screws are locked ;
Monkey Wrench
Torque: 1.5±0.2N·m
Φ10 drill
b)
Screw
Inner hexagonal
wrench
d)
X1-Hybrid G4
inverter
Hexagon keys
Torque: 1.5±0.2N·m
Philips screwdriver
Torque: 1.5±0.2N·m

Advertisement

loading
Need help?

Need help?

Do you have a question about the X1-Matebox and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SolaX Power X1-Matebox

  • Page 1 Use a level first to ensure that the brackets (battery bracket, bracket A, bracket B, bracket C, inverter Load Load connection port bracket) in the system are firmly installed and level. Then follow the steps below to hang X1-Matebox. Battery connection port(tobatterypack) a)Before install the inverter, connectthe ground...
  • Page 2 According to the PV 1 (INV )+ / PV1 (INV )- / PV2(INV )+ / PVZ(INV )- /BAT(INV )+ / BAT(INV ) line symbol on X1-Matebox, Correspond to the PV 1 + / Pv1- / PV2 + / Pv2- / BAT + / BAT- ports of the inverter.