SolaX Power X1-Matebox Quick Installation Manual

SolaX Power X1-Matebox Quick Installation Manual

Advertisement

Quick Links

Quick Installation Guide
1. Introduction
X1-Hybrid G4
Grid
Off-grid
Main Breaker
X1-Matebox
N
Battery
Distrbution Box
Loads
2. Overview
533 mm
Object
Name
Description
A
PV connection port (PV array)
Off-grid1
B
Off-grid1output portof the inverter
Grid1
C
Grid1 output portof the inverter
D
Load
Load connection port
Battery connection port(tobatterypack)
E
Reserved
F
G
Off-grid 2
Reserved
H
Grid 2
Reserved
I
Gridconnection port (to local grid)
J
Grid
K
L
Battery connection port of the inverter
M
3. Preparation
3.1 Check Packing List
5-6
Bracket B *1
Bracket A *1
terminals * 6
Bracket C *1
N-terminal adjacent
5-6
mm² Battery
13-15
mm²
Earthing
power line
bridge *1
R type
conductor
(negative*1,positive*1)
terminal*1
*1
3.2 Tools
Phillips Screwdriver
Diagonal Plier
Hexagon keys
Crimping Tool
4. Mounting
X1-Matebox
Matebox
Grid
X1-Hybrid G4
Off-grid
Grid
Main Breaker
X1-Matebox
Grid
Battery
Loads
185 mm
A B C
G H I J
M
(Expansion bolt ,
13-15
mm²
Gasket ,Self-tapping
mm² European
European
bolt) *2
terminals * 4
Quick Installation Guide
Quick Installation
Flange nut *4
Guide X 1
Crimping Plier
Monkey Wrench
Φ10 Drill
Slotted Screwdriver
Marker Pen
Rubber hammer
Inverter bracket
Bracket B
Bracket A
Bracket C
Battery bracket
1)
Step 1: Screw the wall bracket on the wall
First splice the inverter bracket, bracket A, bracket B, and battery bracket according to the steps, and
then fasten them to the wall.
Fix the inverter bracket on the support B;
Then set the bracket C on the bracket A ;
Load
Step 2: Install the T-BAT-SYS-3.0 battery bracket; (Please refer to T-BAT-SYS-3.0
battery quick installation guide)
Step 3: Mounting bracket A
The mounting method of the X1-Matebox bracket is as follows:
a) Use the bracket as a template to mark the two holes
on the wall with a marker pen.
N
Grid
Distrbution Box
c) Insert expansion bolt into the hole, use rubber hammer
to knock the expansion screw bolt into the wall.
D E F
Rubber hammer
Torque :2.5±0.2N·m
K
L
Step 4: Finally install the X1-Hybrid G4 inverter bracket (please refer to the
X1-Hybrid G4 inverter quick installation guide).
Step 5. Install the X1-Matebox on the wall and lock the screws.
Use a level first to ensure that the brackets (battery bracket, bracket A, bracket B, bracket C, inverter
bracket) in the system are firmly installed and level. Then follow the steps below to hang X1-Matebox.
a) Before the installation of the inverter, connect
the ground wire rstly, and remove the "DONGLE"
waterproof cover (for the installation of
communication accessories); Please refer to the
pocket dongle ( WiFi) quick installation guide.
X1-Hybrid G4 inverter
C) Open the X1-Matebox buckle, remove the cover, and take out the front protective cover.
Warranty
Form
Registration
For Customer (Compulsory)
Name
Country
Phone Number
Email
State
Address
Zip Code
Product Serial Number
Date of Commissioning
Installation Company Name
Installer Name
Electrician License No.
For Installer
Module ( If Any )
Module Brand
Module Size(W)
Number of String
Number of Panel Per String
Battery ( If Any )
Battery Type
Brand
Date of Delivery
Number of Battery Attached
Signature
to complete the online warranty registration or use your mobile phone to
Please visit our warranty website: https://www.solaxcloud.com/#/warranty
scan the QR code to register.
to check it.
For more detailed warranty terms, please visit SolaX official website: www.solaxpower.com
614.00002.07
Warranty
Registration
Form X 1
5. Monitor the antenna connections of accessories
a)
Inverter bracket
b)
Bracket B
Bracket A
200.00mm
c)
2)
Inverter bracket
Monkey Wrench
Bracket B
Torque: 1.5±0.2 N·m
Bracket A
Monkey Wrench
Bracket C
Torque: 1.5±0.2 N·m
Battery bracket
b) Drill holes at marked spots with depth of 80 mm.
a)
d ) The bracket is aligned with the screw uses the
inner hexagonal wrench to screw the tapping screw
until the expansion bolt "bang" is heard.
Expansion
bolts
c)
b) Firstly install the battery and inverter on the wall,
and then install the X1-Matebox on the wall;
Upgrade/
Dongle
Then set the bracket B on the bracket A and fix it
with screws;
Monkey Wrench
Torque: 1.5±0.2 N·m
Then the bracket C is fixed on the battery
bracket and the screws are locked ;
Monkey Wrench
Torque: 1.5±0.2 N·m
Φ10 drill
b)
Screw
Inner hexagonal
wrench
d)
X1-Hybrid G4
inverter
Hexagon keys
Torque: 1.5±0.2 N·m
Philips screwdriver
Torque: 1.5±0.2 N·m

Advertisement

loading
Need help?

Need help?

Do you have a question about the X1-Matebox and is the answer not in the manual?

Questions and answers

Summary of Contents for SolaX Power X1-Matebox

  • Page 1 Use a level first to ensure that the brackets (battery bracket, bracket A, bracket B, bracket C, inverter Load Load connection port bracket) in the system are firmly installed and level. Then follow the steps below to hang X1-Matebox. Battery connection port(tobatterypack) a) Before the installation of the inverter, connect...
  • Page 2 According to the PV1(INV )+/PV1(INV )-/PV2(INV )+/PV2(INV )-BAT(INV )+BAT(INV )-l line symbol on X1-Matebox, correspond to the PV 1+/PV1-/PV2+/PV2-/BAT+/BAT- ports of the inverter. b) Connect the CT cable of the X1-Matebox to the CT port of the inverter, and tighten the waterproof plug.