8.Lifting operations
• Have lifting gear and apparatus regularly
inspected and tested by qualified persons
• Isolate and cordon off lifting areas to keep out
non-construction personnel
• Ensure that lifting routes do not cross buildings
or people, and avoid collision with objects
• Do not exceed safe working load limits
9.For on-site workers
• Plan all work
• Turn off power (work with live parts de-energized
whenever possible)
• LOTO (Lock Out, Tag Out)
• Live electrical work permit (input terminals with
HV after door open)
• Use personal protective equipment (PPE)
• Safe workplace conditions and space
• Adhere to other occupational health, safety and
security codes, such as those published by OSHA
10.Reference standards
Adhere to the following codes:
• NFPA-70E -2021 Sec 110.3 (Electrical Safety in
the Workplace)
• NFPA-70E -2021 Sec 130.4 (Shock Risk
Assessment)
• NFPA-70E -2021 Sec 130.5 (Arc Flash Risk
Assessment)
20 DC EVSE Standalone DC Fast Charger

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DC Series and is the answer not in the manual?

This manual is also suitable for:

Dc evse

Table of Contents