TMG -GH1230 Product Manual

12' x 30' tunnel greenhouse grow tent
Hide thumbs Also See for TMG-GH1230:

Advertisement

www.tmgindustrial.com
0/20
TOLL FREE:1-877-761-2819

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TMG-GH1230 and is the answer not in the manual?

Questions and answers

Summary of Contents for TMG TMG-GH1230

  • Page 1 www.tmgindustrial.com 0/20 TOLL FREE:1-877-761-2819...
  • Page 2: Main Specifications

    MAIN SPECIFICATIONS : Overall assembled size : W3.66 x L9.1 x H2.2 (m) / W12 x L29.9 x H7.2 (ft)  Shoulder height : H1.2 m / 3.9 ft  Door : W1.2 x H1.8 (m) / 3.9 x 5.9 (ft) ...
  • Page 3 The layout of foundation(two).  Note: the ground anchor is installed on the cement block. Depth of cement Unit: mm (ft) www.tmgindustrial.com 2/20 TOLL FREE:1-877-761-2819...
  • Page 4: Prior To Assembly

    Baseplate layout.  PRIOR TO ASSEMBLY Please read the instructions carefully before installation. It is important to follow your local safety regulations and industry standards during installation. Regulations may include but are not limited to : Safety helmets, protective eyewear, and clothing ...
  • Page 5 TMG-GH1230 PART LIST PARTS GRAPHICAL DESCRIPTION LENGTH LENGTH CODE Peak arch tube L542mm L542mm Upper rafter tube L1404mm L1404mm Shoulder tube L865mm L865mm Sidewall tube L668mm L668mm Roof purlin L1330mm L1330mm (horizontal tube) Base plate L163mm L163mm Door column base plate...
  • Page 6 Door frame right tube L1820mm L1820mm (front truss) Door frame column left tube L1760mm L1760mm Door frame column right tube L1760mm L1760mm Door horizontal tube L1090mm L1090mm Film rolling machine guide tube L1490mm L1490mm Roll film tube L1993mm L1993mm Roll film tube L1400mm L1400mm Tube clamp...
  • Page 7 Hex bolt M6x45 M6x45mm Hex bolt M6x80 M6x80mm Self tapping screw #12x25 #12x25mm Self tapping screw #12x35 #12x35mm Self tapping screw #12x35 #12x35mm Socket wrench Hex wrench Square plug 30x30mm 30x30mm Round plug φ φ25mm Braided rope bundle Adhesive tape Top cover film W7.5xL10m Front and rear film...
  • Page 8: Installation Steps

    INSTALLATION STEPS STEP 1 : REVIEW THE WHOLE STRUCTURE AND CHOOSE THE PROPER INSTALLATION SITE STEP 1 : REVIEW THE WHOLE STRUCTURE AND CHOOSE THE PROPER INSTALLATION SITE. Mark the ground in the final building location with a line Mark the ground in the final building location with a line showing the positions of base plates, front doors. All showing the positions of base plates, front doors.
  • Page 9 STEP 2 : ASSEMBLE ALL TRUSSES. The building includes 8 trusses , Connect all pipes with hex bolt (#26). trusses , Connect all pipes with hex bolt (#26).  PART PART www.tmgindustrial.com www.tmgindustrial.com 8/20 TOLL FREE:1 TOLL FREE:1-877-761-2819...
  • Page 10 Lay down all (8) trusses on the ground when the ) trusses on the ground when the assembly is all completed and before moving to next step assembly is all completed and before moving to next step,  and then wrap (#34) around the sharp points of the joint to avoid friction between the fabric and the interface, and then wrap (#34) around the sharp points of the joint to avoid friction between the fabric and the interface, and then wrap (#34) around the sharp points of the joint to avoid friction between the fabric and the interface, resulting in fabric damage.
  • Page 11 STEP 3 : PUT UP ALL TRUSSES. Put up the truss, use hex bolt (#26) to secure the truss to the base plates Put up the truss, use hex bolt (#26) to secure the truss to the base plates.  Connect all purlins, and then wrap (#34) around the sharp points.
  • Page 12 STEP 4 : INSTALLATION OF FRONT AND REAR TRUSSES. INSTALLATION OF FRONT AND REAR TRUSSES. Installation of the front truss. Installation of the front truss.  PART PART www.tmgindustrial.com www.tmgindustrial.com 11/20 TOLL FREE:1 TOLL FREE:1-877-761-2819...
  • Page 13 Installation of the rear truss. Installation of the rear truss.  PART PART www.tmgindustrial.com www.tmgindustrial.com 12/20 TOLL FREE:1 TOLL FREE:1-877-761-2819...
  • Page 14 STEP 5 : INSTALL BOARDS (#36) AND REED GROOVE (#22) REED GROOVE (#22). Fix the board (# 36) with self tapping screw (# 29).  Fix the reed groove (# 22) with the self eed groove (# 22) with the self tapping screw (# 28). ...
  • Page 15 PART PART www.tmgindustrial.com www.tmgindustrial.com 14/20 TOLL FREE:1 TOLL FREE:1-877-761-2819...
  • Page 16 STEP 6 : INSTALL THE FILM. Install the front film.  PART PART www.tmgindustrial.com www.tmgindustrial.com 15/20 TOLL FREE:1 TOLL FREE:1-877-761-2819...
  • Page 17 Install the rear film.  PART www.tmgindustrial.com www.tmgindustrial.com 16/20 TOLL FREE:1 TOLL FREE:1-877-761-2819...
  • Page 18 When you are ready to install the roof cover, unpack the cover and position it parallel to the building frame on hen you are ready to install the roof cover, unpack the cover and position it parallel to the building frame on hen you are ready to install the roof cover, unpack the cover and position it parallel to the building frame on ...
  • Page 19 STEP 7 : INSTALL ROLL FILM SYSTEM. Install the roll film tube(#18), add a round plug(#32) at the end. t Install the roll film tube(#18), add a round plug(#32) at the end. the film (#35) is wound on a roll film tube , 35) is wound on a roll film tube , ...
  • Page 20 Around plug (#32) is put on both ends of the 32) is put on both ends of the film rolling machine guide tube (#17), and the guide tube is 17), and the guide tube is  mounted on the frame with a hex bolt (# on the frame with a hex bolt (#27), and it is required to swing freely.
  • Page 21: After The Installation

    AFTER THE INSTALLATION Walk around and inspect the greenhouse periodically to make sure all components are still firmly secured and the whole greenhouse is well supported. Check all bolts and nuts as well as all connection points to make sure they are all in good position.

Table of Contents