Download Print this page

TMG -GH1220 Product Manual

12ft x 20ft tunnel greenhouse grow tent

Advertisement

Quick Links

W W W . T M G I N D U S T R I A L . C O M
P 0 / 15
T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

Advertisement

loading
Need help?

Need help?

Do you have a question about the TMG-GH1220 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for TMG TMG-GH1220

  • Page 1 W W W . T M G I N D U S T R I A L . C O M P 0 / 15 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 2: Main Specifications

    Main specifications Overall assembled size : L6.5 x W3.66 x H2.2 (m) / L21 x W12 x H7.2 (ft)  Shoulder height : H1.2 (m) / 4ft  Door : W1.2 x H1.8 (m) / 4 x 6 (ft)  Prior to assembly Please read the instructions carefully before installation.
  • Page 3 TMG-GH1220 Part List Parts Graphical Description code Peak arch tube Upper rafter tube Shoulder tube Sidewall tube Roof purlin (horizontal tube) Base plate Door column base plate Expansion boltφ14x100mm Front door cross tubes Rear door cross tubes Upper vertical tubes for rear truss...
  • Page 4 Roll film tube Roll film tube Tube clamp Door buckle Film rolling machine Reed groove Clip spring Eight clip spring Pressure film carrier Half round head bolt M6x50 Hex bolt M6x45 Hex bolt M6x80 Self tapping screw #12x25 Self tapping screw #12x35 Self tapping screw #12x35 W W W .
  • Page 5 Socket wrench Hex wrench Square plug Round plug 1 bundle Braided rope (20m) Adhesive tape 1 volume Top cover film Front and rear film Board 34 meters (not included) W W W . T M G I N D U S T R I A L . C O M P 4 / 15 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 6 Installation steps Step 1 : Review the whole structure and choose the proper installation site Mark the ground in the final building location with a line showing the positions of  base plates, front doors. All lines should be drawn from center to center of all base plate tubes.
  • Page 7 Figure 2 Part Part Lay down all (6) trusses on the ground when the assembly is all completed  and before moving to next step, and then wrap (#34) around the sharp points of the joint to avoid friction between the fabric and the interface, resulting in fabric damage.
  • Page 8 Step 3 : Put up all trusses Put up the truss, use hex bolt (#26) to secure the truss to the base plates.  Figure 4 Connect all purlins.  Figure 5 Part W W W . T M G I N D U S T R I A L . C O M P 7 / 15 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 9 Step 4 : Installation of front and rear trusses Installation of the front truss.  Figure 6 Part Part W W W . T M G I N D U S T R I A L . C O M P 8 / 15 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 10 Installation of the rear truss.  Figure 7 Part Part Step 5 : Installing boards (#36) and reed groove (#22) (refer to figure 8, figure 9) Fix the board (# 36) with self tapping screw (# 29).  Fix the reed groove (# 22) with the self tapping screw (# 28). ...
  • Page 11 Figure 8 Figure 9 W W W . T M G I N D U S T R I A L . C O M P 10 / 15 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 12 Part Part Step 6 : Install the film Install the front film.  Figure 10 Part Part W W W . T M G I N D U S T R I A L . C O M P 11 / 15 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 13 Install the rear film.  Figure 11 Part when you are ready to install the roof cover, unpack the cover and position it  parallel to the building frame on one side. the cover must be pulled over the top of the truss frame without being snagged or stressed on any frame members.
  • Page 14 Figure 12 Part Step 6 : Install roll film system Install the roll film tube(#18), add a round plug(#32) at the end. the film (# 35)  is wound on a roll film tube , and clamped with a pressure film carrier (# 24). W W W .
  • Page 15 Figure 13 Part Part A round plug (# 32) is put on both ends of the film rolling machine guide tube  (# 17), and the guide tube is mounted on the frame with a hex bolt (# 27), and it is required to swing freely.
  • Page 16 Figure14 Part Part After the Installation Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported. Check all bolts and nuts as well as all connection points to make sure they are all in good position. We strongly recommend you remove any snow from the roof immediately.