Download Print this page

TMG -PT2020F Product Manual

20' x 20' fully enclosed party tent

Advertisement

Quick Links

Main Specifications :
0/20
TOLL FREE:1-877-761-2819
►www.tmgindustrial.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the TMG-PT2020F and is the answer not in the manual?

Questions and answers

Summary of Contents for TMG TMG-PT2020F

  • Page 1 Main Specifications : 0/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 2 MAIN SPECIFICATIONS : - Assembly size : W6 x L6 x H3.1 (m) / 19.7 x 39.4 x10.2 (ft) - Shoulder wall clearance height : 2 m / 6.6 ft PRIOR TO ASSEMBLY Please read the instructions carefully before installation. It is important to follow your local safety regulations and industry standards during installation.
  • Page 3 FRAME STRUCTURE DIAGRAM. 2/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 4 TMG-PT2020F PART LIST PARTS GRAPHICAL DESCRIPTION LENGTH CODE Peak arch tube L480mm Peak arch tube L480mm Rafter tube L1421mm Rafter connection pipe L262mm Rafter connection pipe L276mm Shoulder tube L445mm Shoulder tube L445mm Column tube L1877mm Lower cross tube L2030mm...
  • Page 5 Hex bolt and nuts M10x30 Hex bolt and nuts M6x60 Ground pegs L180mm Tension hook L45mm Ground pegs L305mm Connecting piece L65mm Ball rope L150mm Roof cover Side cover W2220xL5940mm Front and rear fabric panels W3280xL5980mm Braided rope V-spring buckle (φ8) 4/20 TOLL FREE:1-877-761-2819...
  • Page 6 STEP 1 :INSTALL V-SPRING BUCKLE PART 5/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 7 STEP 2 : ASSEMBLE FRONT AND REAR TRUSSES. PART PART 1×2 2×2 4×2 1×2 2×2 4×2 2×2 6/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 8 STEP 3 : ASSEMBLE MIDDLE TRUSSES. PART PART 1×2 2×2 4×2 1×2 2×2 4×2 2×2 7/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 9 STEP 4 : CONNECT THE FRONT TRUSS AND THE 2ND TRUSS THROUGH PURLINS ( #7 ). PART 8/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 10 STEP 5 : REPEAT ABOVE STEP TO PUT UP ALL OTHE TRUSSES (FROM 3RD TO 7TH TRUSS), AND CONNECT ALL PURLINS ( #7 ). PART 9/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 11 STEP 6 : INSTALL ROOF COVER ( #21 ) . PART 10/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 12 STEP 7 : ASSEMBLE PART ( #5 ). Note: 4-5people are required to lift or use the crane is a better choice. PART 11/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 13 STEP 8 : INSTALL THE DIAGONAL BRACING BARS ( #10 ). PART 12/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 14 STEP 9 : TENSION THE ROOF COVER. PART 13/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 15 STEP 10 : ASSEMBLE PART ( #6 ). PART 14/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 16 STEP11 : ASSEMBLE PART ( #7,#11,#12 ). PART PART 15/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 17 STEP 12 : FIXED BASEPLATE. PART 16/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 18 STEP 13 : INSTALL THE FRONT AND REAR FABRIC PANELS ( #23 ). PART 17/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 19 STEP 14 : INSTALL SIDE COVER ( #24 ). PART 18/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 20 STEP 15 : FIXED FOUR CORNERS. PART 19/20 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
  • Page 21 AFTER THE INSTALLATION Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported. Check all bolts and nuts as well as all connection points to make sure they are all in good position.