Overlap Apex Shed
6' x 4'
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This buildings is pressure treated to ensure longevity of all
timber components and to protect against rot. This may leave
a colour difference on some parts that will even out as the
moisture content stabilises. This will not need additional
treatment.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
- The roof of this building is not a load bearing structure.
- This product must be built on a solid level base.
0333 7777 089
Technical Help line:
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to. If the product is not constructed in accordance with the
instructions, or is altered in anyway (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
Not to Scale
Fixing Pack (OPA46FP)
This fixing pack is used for several products.
There may be additional fixings.
Hasp &
Staple
Flush Hinge
Qty 2
10mm Felt tacks
Qty 100
REQUIRED TOOLS :
(NOT SUPPLIED)
SHARP KNIFE
SPIRIT LEVEL
POZI DRIVE
TAPE MEASURE
HAMMER
SCREWDRIVER
Important :
Assembly of this
shed requires a
Must Pre drill for
minimum of two
each screw used.
adults.
OPA46NW PARTS LIST
C
A
B
OPA4PE
OPA4DE
PLAIN END
PLAIN SIDE QTY 2
DOOR END
I
J
51120810PAII58PT
810mm BARGE BOARD QTY 4
1 1
E
Place the panels on top of the floor. Make sure that all the panels are tight and flush before
fixing them to each other using 3x50mm screws.
Make sure that the panels are sitting flush before fixing to the floor using 50mm screws making
sure that all of the screws are positioned so that they screw into the bearers underneath.
3x50mm screws for the sides.
2x50mm screws for the plain and door ends.
3
J J
Place the corner strips so that they cover the joins
between the panels. Fix each in place using 3 x 30mm
screws
D
E
OPA6PS
BRDFL46
SDRPT
FLOOR
DOOR
K
44161570PT
1570mm C/STRIP QTY 4
Top View
2
B
L
C
C
A
A
a
Fix the 20 x 1695mm strip to the side
of the door frame so that it is tight
with the cladding and flush with the
frame. Use 3 x 30mm screws.
F
G
FIN20010512PT
Finial
QTY 1
H
H
17917658
ROOF SHEET
1753mm BATTEN QTY 1
QTY 2
L
37281791PT
1791mm BATTEN QTY 2
A
E
b
Place the hinge against the inside of the door frame and
position the large section of the hinge so that it is flush
with the inside of the framing as shown. Fix with 25mm
screws.
Open the hinge and fix the smaller section to the door
framing. Again make sure that the hinge is flush and that
the holes are positioned so that the 25mm screws locate
correctly into the batten.
4
H
Place the 1753mm batten so that it connects the door end and plain
end. Fix this in position using a 50mm screw for each end as shown.
85052 QTY 1
45281753PT
20121695PPT
20 x1695mm STRIP QTY 1
Issue 0117
Need help?
Do you have a question about the OPA46NW and is the answer not in the manual?
Questions and answers