This guide is intended to be used as a recommended sequence of work steps but does not
supersede the instruction manual (IB-101-EV2) or assembly drawings. For assistance,
contact the Southern States Service Division (available 24/7) at 770-946-4565.
Scan for full instruction manual
Publication No. QSG101-EV-2 R5 09082023
3
MOUNT PHASES PER ENGINEERING DRAWINGS
Refer to operating mechanism drawing for pole orientation and mounting
SECURE
BLADE WITH
WARNING
TIES DURING
LIFTING
Special Handling Required -
A qualified rigger and lift plan are
required due to possible off center,
high, center of gravity. Lift by switch
base only.
SLING ATTACHMENT
Refer To Instruction Book Section: Installation & Adjustment Procedures
INSTALL ADJUSTABLE ARM
6
& DRIVE PHASE CLEVISES
Drive Phase Clevis
Vertical Pipe
Adjustable Arm
Refer To Instruction Book Section: Installation & Adjustment Procedures
1
REVIEW BILL OF LADING (BOL)
A.
Check the materials received against the packing list
B.
Report any shortages or damaged equipment to Southern States
C.
A typical shipment will include:
- 3 phase switch (base, insulators, & live parts)
- Operating mechanism box
- Operating pipe
Note: All material is marked with JO number
CAUTION
Because the phase is top heavy, the
base must be bolted to the structure
before removing lifting straps to
prevent tipping.
Typical Mounting
Bolt Locations
CONNECT & TIGHTEN DRIVE PIPE BETWEEN
7
ADJUSTABLE ARM & AUXILIARY ARM WITH
APPROPRIATE CLEVISES
Step 7.1
Set switch to closed position
Step 7.2
Set adjustable arm radius to
recommended length and set to
closed position
Refer To Instruction Book Section: Installation & Adjustment Procedures
MOUNT VERTICAL BEARING,
4
PIPE, & OPERATOR
1/4" to
3/8" gap
Mounting Bolt
Locations
Vertical Bearing Support
Vertical Pipe
Operator
Refer To Instruction Book Section: Installation & Adjustment Procedures
NOTE:
DO NOT PIERCE ADJUSTABLE ARM
CLEVIS.
Step 7.3
Set 12" DIM. and
tighten Clevis
Step 7.4
Pierce pipe
2
REVIEW BILL OF MATERIAL (BOM)
A.
Inventory all parts against the BOM found on the op-mech sheet inside
the drawing package
B.
Report any missing or damaged parts to Southern States
F
A
E
H
C
I
PIERCE VERTICAL BEARING
5
SET-SCREW COMPLETELY
Vertical
NOTE: Ensure the full weight of the
Bearing
vertical pipe is supported by the vertical
Support
bearing and maintain the gap required
between the coupling and gear operator.
Then pierce collar. Also, confirm auxiliary
arm assembly is correctly mounted per the
operating mechanism drawing.
Refer To Instruction Book Section: Installation & Adjustment Procedures
MATCH-MARK CLEVIS
8
CONNECTIONS, ADJUSTABLE
ARM, & OPERATOR COUPLING
TO MONITOR SLIPPAGE
Drive Pipe
Note: Veritcal Pipe removed for clarity
Refer To Instruction Book Section: Installation & Adjustment Procedures
G
J
TERMINOLOGY OVERVIEW
A: Live Parts
B: Insulator
D
C: Base
D: Jaw
B
E: Blade
F: Counterbalance
G: Contact Fingers
H: Switch Operating Arm
I: Bearing
J: Arcing Horns
Vertical Bearing Set Screw
(Pierce Bolt)
Need help?