•
Nominal Capacity – complete the nominal capacity value for the batteries.
•
Actual Capacity – complete the real capacity value for the batteries.
•
Installation Date – complete the back up battery installation date.
If the device has valid time and date values (from the provider network or NTP), the battery
installation date is set automatically if the following conditions are met:
•
the device has received a valid certificate from 2N
connects to 2N
•
any phone call or modem connection has been established,
•
SIP registration has been successful,
•
attempt to log in the user to the web interface has been made.
®
Elevator Center,
2N® EasyGate IP User Manual
®
Elevator Center and
105 / 127
Need help?
Do you have a question about the EasyGate IP and is the answer not in the manual?