Download Print this page

Toro GeoLink 131-7260 Installation Instructions Manual page 2

Spray system finishing kit

Advertisement

Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Description
No parts required
No parts required
Switch plug (pivoting hose reel kit—Toro
Part No. 99-7420)
Tube assembly (Toro Part No. 114-9553)
Cable tie
No parts required
No parts required
No parts required
No parts required
No parts required
Rear wire harness
Cable tie
Switch plug
Cap (quick coupler)
Retainer
Cable tie
Flange-head bolt (3/8 x 1 inch)
Flange locknuts (3/8 inch)
Center boom extension
Cylinder mount (wide)
Tie plate (wide)
Carriage bolt (1/2 x 1-1/4 inches)
Flange locknut (1/2 inch)
Sprayer nozzle
Hose assembly (sprayer valve 5 or 6)
Flange locknut (5/16 inch)
Qty.
Prepare to install the kit.
Disconnect the rear wire harness from
the optional attachment.
Disconnect the optional pivoting hose
1
reel kit.
2
Disconnect the optional foam-marker kit.
8
Disconnect the ultra sonic boom kit.
Remove the center section
cover (11-nozzle) of the optional
covered-boom kit.
Remove the undercarriage shroud.
Remove the engine-control module and
mounting bracket (machine models with
gasoline engines).
Disconnecting the pressure-sense tube
for the dash gauge.
Remove the rear wire harness for the
1
machine.
1
Remove the rate-control switch.
1
3
Remove the boom-section valves.
3
1
Remove the boom sections.
2
2
1
1
Install the center boom extension.
1
4
4
2
Install the mount brackets and sprayer
2
nozzles to the center boom section.
2
2
Use

Advertisement

loading
Need help?

Need help?

Do you have a question about the GeoLink 131-7260 and is the answer not in the manual?