Preparing The Enclosure; Required Tools - Silhouette DIM32D2BSSPR Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS

PREPARING THE ENCLOSURE

Gloves and safety goggles should be worn during
installation.
It is not recommended to install the appliance into
a corner or directly beside a wall. The door will
need to be opened more than 90° to allow for the
removal of the ice bucket. If it is necessary to place
the unit next to a wall or in a corner, leave at least
2-4 inches (5-10 cm) of space between the wall and
the appliance to allow for the door opening.
The cabinet opening must be at least 15.3 inches
(39 cm) wide by 35 inches (88.9 cm) high by 25
inches (63.5 cm) deep.
Note: The listed depth requirement is assuming that
the electrical outlet and the water supply are located
in the adjacent cabinetry or flush mounted in the
rear wall, not surface mounted inside the enclosure.
If the electrical outlet and water supply are located
inside adjacent cabinetry, cut a 1.5 inch (3.8 cm)
diameter hole to admit the power cord and water
inlet hose. If the cabinet wall is metal, the hole edge
must be covered with a bushing or grommet.
1.5 in (3.8 cm) diameter
35 in
*If electrical outlet in
(88.9 cm)
adjacent cabinetry
Electrical and Water Access
25 in
(63.5 cm)
15.3 in (39 cm)

REQUIRED TOOLS

Safety goggles
Gloves
Tape measure
Carpenter square
Level
Flashlight
Electric drill with hole bit
Safety goggles
Electric drill with hole bit
Gloves
2 in (5 cm)
6 in
(15.2 cm)
90°
4
Tape measure
Carpenter square
Flashlight
Level

Advertisement

Table of Contents
loading

Table of Contents