Download Print this page
Kohler PANACHE K-22106T-2 Installation Instructions Manual
Kohler PANACHE K-22106T-2 Installation Instructions Manual

Kohler PANACHE K-22106T-2 Installation Instructions Manual

Vitreous china floor standing toilet
Hide thumbs Also See for PANACHE K-22106T-2:

Advertisement

Quick Links

·
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
·
All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler China reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
·
These instructions contain important care, cleaning, and
warranty information -
please leave instructions for the
consumer
.
ORDERING INFORMATION
PANACHE WF Toilet (HT100 MEC IWT) ..............K-22106T-2
Includes PANACHE Bowl ................................K-18154T-2
Includes ODEON Inwall Tank
W/O Iron Rack................................K-6286T-PN2
Includes
PANACHE Toilet Seat
®
Includes
P-Trap
....................................................1036901
PANACHE WF Toilet (HT100 MEC IWT)............K-22106T-S2
Includes PANACHE Bowl ................................K-18154T-2
Includes ODEON Inwall Tank
W/O Iron Rack .............................K-6286T-PNS2
Includes
PANACHE Quiet-close Toilet Seat
®
Includes
P-Trap
....................................................1036901
NOTES
·
Observe all local plumbing and building codes.
·
Shut off the water supply.
·
51mm (2") passageway.
·
Ensure that the new drain has the correct roughing-in
dimension.
·
Carefully inspect the new fixture for any sign of damage.
·
For new construction, refer to the dimensions in
for locating the shut-off valve.
·
Fixture dimensions are nominal and conform to tolerances
established by ASME Standards (A112.19.2-2013).
·
This product complies with GB 25502-2017. Water
Efficiency Grade 2.
KOHLER CHINA INVESTMENT CO., LTD
1204812-T01-D
...........................K-4760T
.....K-17674T
Fig. #1
JING'AN DISTRICT, SHANGHAI, PRC
(
)
VITREOUS CHINA FLOOR STANDING TOILET
·
·
·
(
..................................................K-18154T-2
(
) ....................................................K-6286T-PN2
....................................................1036901
(
................................................K-18154T-2
(
) ..................................................K-6286T-PNS2
....................................................1036901
·
·
·
51mm
·
·
·
·
2013)
·
GB 25502-2017
NO.158, JIANG CHANG SAN ROAD,
POST CODE: 200436
158
©
Copyright Kohler China Investment Co., Ltd. 2018
-1-
©
PANACHE
INSTALLATION INSTRUCTIONS
K-22106T-2/K-22106T-S2
100
).............K-22106T-2
.....................................K-4760T
100
)...........K-22106T-S2
.............................K-17674T
1
ASME
(A112.19.2-
2
200436
-
2018

Advertisement

loading

Summary of Contents for Kohler PANACHE K-22106T-2

  • Page 1 · · All information in these instructions is based upon the latest product information available at the time of publication. Kohler China reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. ·...
  • Page 2 Reference Value UNIT: mm Finished Wall L of Inlet L of Outlet Inlet Outlet Floor Fixings Finished Wall Finished Wall Finished Wall 90-110 1036901 1206391 P-Trap S-Trap(Optional) Fig.#1 Kohler reserves the right to change marked dimensions without prior notice. 1204812-T01-D...
  • Page 3: Installation

    INSTALLATION 1. INSTALL THE TANK 1) Turn the water supply off before installing the new toilet. 2) Install the concealed tank system in wall before decorating the wall. 3) Install the tank system per tank's installation instructions. 2. INSTALL THE BOWL 1) Put the bowl in position and mark a line along the back of the bowl.
  • Page 4: Consumer Responsibilities

    (calcium hypochlorite) can seriously damage fittings in the tank. This damage can cause leakage and property damage. Kohler Company shall not be responsible or liable for any damage to these tank fittings caused by the use of cleaners containing chlorine (calcium hypochlorite).
  • Page 5 Kohler will not be responsible for any damage related to above mentioned cleanser or solvent. Do not apply spares that are not provided by Kohler, and please note that glass adhesive tape shall not be applied to the installation of Kohler spares. Kohler will not be responsible for any damage related to installation with spares not provided by Kohler.
  • Page 6 05/7/13 Design And Installation Concept Of In-wall Tank Installation of in-wall tank is much easier and nice-looking comparative to that of traditional tank. Meanwhile, the space layout will be more reasonable due to the application of in-wall tank pipes and connectors. The most remarkable advantage of in-wall tank is that the installation will never be limited to certain area, and can be installed wherever as you wish, which will make the...
  • Page 7 5~45 Height to floor is decided by bowl Finished Floor Kohler reserves the right to change marked dimensions without prior notice. INSTALLATION Make sure of h according to dimensions of bowl and then locate the installation hole of fixing bracket.
  • Page 8 2. Put the tank onto the fixing bracket as shown in the right figure and adjust the tank to level . Then tighten screws with hex-head key. Note: it is a must to keep the tank level. Connect the inlet hose with tank inlet pipe. Note: 1.
  • Page 9 5. When finishing the brickwork, eliminate unwanted part of Mask mask, drainage pipe and inlet pipe. Note: When building the wall, the product cannot be cast Sharp Knife and filled by cement or be squeezed. Inlet Pipe Drainage Pipe 6. When fixing the adjustable board to block shield, the locknut should be put directly on positong of the sign of "...
  • Page 10 8. Install the faceplate as shown in the illustration. Put the lock on the faceplate directly on the reversed lock on adjustable board, then push the faceplate and lock it. The installation shall begin from bottom to top. Lock Adjustable Board Reversed Lock Faceplate 9.
  • Page 11 MAINTENANCE AND CONTROL PROCEDURES MAINTENANCE AND CONTROL PROCEDURES 1. Hold the faceplate with both hands and push upward to take down the faceplate. Faceplate Faceplate 2. Tighten the locknut to the marked position of OPEN to " " take out the adjustable board. OPEN Locknut 3.
  • Page 12 4. Wash Filtration Net Close corner valve first, then loosen and take out the tighten nut, and wash the waste on filtration net with clean water. Then reset the tighten nut to the original position. Open Close Corner Valve Tighten Nut Loosen Nut Filtration Net 5.
  • Page 13: Troubleshooting Procedures

    7. Adjust Inlet Valve Hoist and reduce the water level in the tank by adjusting the control pole. Turn the control pole counterclockwise to Floating Box lower down the floating box and reduce the water level of the tank. Turn the control pole clockwise to hoist the floating box and increase the water level in the tank.

This manual is also suitable for:

Panache k-22106t-s2