Download Print this page

Installation - Kohler PANACHE K-22106T-2 Installation Instructions Manual

Vitreous china floor standing toilet
Hide thumbs Also See for PANACHE K-22106T-2:

Advertisement

INSTALLATION

1. INSTALL THE TANK
1) Turn the water supply off before installing the new toilet.
2) Install the concealed tank system in wall before decorating
the wall.
3) Install the tank system per tank's installation instructions.
2. INSTALL THE BOWL
1) Put the bowl in position and mark a line along the back of
the bowl.
2) Place the template on the floor, align to the pencil line and
secure to the floor.
3) Drill the fixing holes with a 10 mm drill as indicated on the
template.
4) Fit the clamps to the floor with the floor plugs, washers
and nuts.
5) Position the bowl and install the soil pipe in accordance
with the manufacturer's instructions.
Note!
An inlet isolating valve must be installed to the bowl.
6) Connect the inlet water supply to the bowl.
7) Secure the bowl in positon with the plastic sleeve and the
screw. Fit the plastic cover cap.
Back edge of pan
Back edge of pan
Wall
Installation template
1204812-T01-D
Fig.#3
3
1.
1)
2)
3)
2.
1)
2)
3)
10mm
4)
5)
6)
7)
Bolt
Washer
Clamp
Floor plug
Fig.#4
4
-3-
Cover Cap
Screw
Plastic Sleeve
Fixing Hole
Fig.#5
5

Advertisement

loading

This manual is also suitable for:

Panache k-22106t-s2