Download Print this page

Kohler PANACHE K-22106T-2 Installation Instructions Manual page 12

Vitreous china floor standing toilet
Hide thumbs Also See for PANACHE K-22106T-2:

Advertisement

4. Wash Filtration Net
Close corner valve first, then loosen and take out the
tighten nut, and wash the waste on filtration net with clean
water. Then reset the tighten nut to the original position.
Close
5. Adjust The Control Pole Of Drainage Valve
Pin the pole first to take out the control button as shown in
the illustration. Then take out the fixing frame with both
hands.
Pole
Control Button
6. Pull out reversed lock on the fixing frame as shown in the
illustration, and adjust the height of the control poles to
ensure the leak-proof of drainage valve.
1206284-T01-C
Open
Corner Valve
Loosen Nut
Fixing Frame
Control Button
4.
Tighten Nut
Filtration Net
5.
6.
Fixing Frame
Pole
-8-
Fixing Frame

Advertisement

loading

This manual is also suitable for:

Panache k-22106t-s2