Download Print this page

Kohler PANACHE K-22106T-2 Installation Instructions Manual page 9

Vitreous china floor standing toilet
Hide thumbs Also See for PANACHE K-22106T-2:

Advertisement

5. When finishing the brickwork, eliminate unwanted part of
mask, drainage pipe and inlet pipe.
Note:
When building the wall, the product cannot be cast
and filled by cement or be squeezed.
5.
6. When fixing the adjustable board to block shield, the
locknut should be put directly on positong of the sign of
"
OPEN .
"
Remark: Stir pole shall remain level.
6.
7. Fix the adjustable board on the wall by tightening the
locknut as shown in the illustration. And the locknut should
be directly put on the position of the sign of LOCK . (Signs
are marked on the adjustable board, please refer to the
indications in installation)
7.
LOCK
)
1206284-T01-C
OPEN
"
"
(
Sharp Knife
Drainage Pipe
Block
Shield
Locknut
Locknut
-5-
Mask
Inlet Pipe
Adjustable Board
Stir Pole
Adjustable Board

Advertisement

loading

This manual is also suitable for:

Panache k-22106t-s2