Powering Up The Dne4500; Verifying The Switch Configuration - Paradyne DNE4500-P Installation Instructions Manual

Ds3 network extenders
Table of Contents

Advertisement

Powering Up the DNE4500

Plug the power supply into the back of the DNE4500 and connect it to the power source.
Verify that the Power LED is illuminated.
The Fast Ethernet 100, Act and Lnk LEDs will remain illuminated until the DS3 link has
been established.

Verifying the Switch Configuration

Ensure that the switches on the back of the DNE4500 are positioned correctly for your
connection. Switches are numbered from left to right; Switch 1 is on the left and
Switch 2 is on the right.
Switch 1 is not used on the subscriber unit (DNE4500-S). Clock source configuration for
the DNE4500-S is determined by the switch setting on the provider unit (DNE4500-P).
Clock Source Switch Configuration
Switch 1
(DNE4500-P only) Clock Source
Down
Up
Transmit Line Buildout Switch Configuration
Switch 2
Down
Up
Local
Loop
Tx Line Buildout
0–255 ft.
255–450 ft.
Switch 1
Switch 2
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dne4500-s

Table of Contents