Static Anchor Procedure - Life Fitness LBR-LC Assembly Instructions Manual

Leg raise/dip/chin
Hide thumbs Also See for LBR-LC:
Table of Contents

Advertisement

• Vacuum (for debris)
Static Anchor
• Floor scanner / rebar detector (optional)
• 1" L-shape SDS rotary hammer
• 1/4" x 12" (6mm x 305mm) carbide drill bit (for 1/4" (6mm) anchors)
• 3/8" x 12" (8mm x 305mm) carbide drill bit (for 3/8" (8mm) anchors)
• Safety glasses
• Extension cord
• Impact wrench
• Vacuum (for debris)

Static Anchor Procedure

CAUTION: If it is possible that the length of your bolt will not provide the minimum requirement of 2.5"
(63.5mm) of engagement, a longer anchor should be used.
1. Place unit into position to be mounted and cycle unit to set stance.
2. Each foot must get at least one static fastener.
3. Wearing protective glasses, drill down into the flooring to the required depth as perpendicular as possible,
ensuring that the foot thickness is being accounted for; refer to Anchor Selection and Foot Dimensions.
Page 14 of 16

Advertisement

Table of Contents
loading

Table of Contents