Checks; Maintenance - Riello CSAL 25 RS Installation Instructions Manual

Table of Contents

Advertisement

Checks

10 CHECKS
On completion of the installation, perform the checks listed in the table below.
Collector circuit
Cold circuit pressure:____bar (see table above)
Collector circuit seal test
Safety valve check
Anti-freeze checked to - ___ °C
pH of heat transfer fluid = ____
Collector circuit bled
Flow rate of 30 l/h per m
Non-return valve functioning

11 MAINTENANCE

Maintenance
Service the system and perform the checks listed in the tables below at least once every two years.
Collector circuit
Cold circuit pressure:____bar (see table above)
Collector circuit seal test
Safety valve check
Anti-freeze checked to - ___ °C
pH of heat transfer fluid = ____
Collector circuit bled
Flow rate of 30 l/h per m
Non-return valve functioning
Checking the heat transfer liquid
Check the anti-freeze effect and the pH level of the heat transfer liquid every 2 years.
− Use an instrument like a refractometer or densimeter to check the anti-freeze effect (which must have a nominal protection
value of approx. -30°C). If the protection threshold is higher than -26°C, replace the mix, or add anti-freeze as required.
− Use litmus paper to check the pH (nominal value approx. 7.5). If the measured value is below 7, change the heat transfer
liquid.
H
checked
2
checked
2
H
up to 15 m
15 - 20 m
20 - 25 m
25 - 30 m
General rule: p [bar] = 1.5 + H [m] / 10
Visual check of collectors
Collectors cleaned if necessary
Visual check of collector fixing points
Visual check of roof impermeability
Visual check of insulation/lagging
Visual check of collectors
Collectors cleaned if necessary
Visual check of collector fixing points
Visual check of roof impermeability
Visual check of insulation/lagging
10
Pressure at boiler
3 bar
3,5 bar
4 bar
4,5 bar
Solar collectors
Solar collectors