Riello AARIA ONE INVERTER 25 Installation And Technical Service Instructions
Riello AARIA ONE INVERTER 25 Installation And Technical Service Instructions

Riello AARIA ONE INVERTER 25 Installation And Technical Service Instructions

Advertisement

AARIA ONE INVERTER
EN
INSTALLATION AND TECHNICAL SERVICE INSTRUCTIONS

Advertisement

Table of Contents
loading

Summary of Contents for Riello AARIA ONE INVERTER 25

  • Page 1 AARIA ONE INVERTER INSTALLATION AND TECHNICAL SERVICE INSTRUCTIONS...
  • Page 2 — Directive 2010/30/EU Indication of the energy consumption on the labels of products related to energy consumption — WEEE Directive 2012/19/EU — ErP Directive 2009/125/EC and Regulation 2012/206/EC RANGE Model Code AARIA ONE INVERTER 25 20131342 ACCESSORIES For the complete list of accessories and the information relating to their usage combinations, please refer to the catalogue.
  • Page 3: Table Of Contents

    AARIA ONE INVERTER TAbLE OF CONTENTS GENERAL INFORMATION ....p. 4 General Notices ......p. 4 Safety precautions .
  • Page 4: General Information

    GENERAl INfORMATION GENERAL INFORMATION This booklet is an integral part of the device, and must General Notices therefore be carefully preserved, and must ALWAYS accom- pany it, even in the event that it is sold to another Owner or User, or is transferred to another system. If it is damaged or lost, another copy can be requested to R Technical When you get the product, check immediately that the con- Support Service in your Area.
  • Page 5: Unit Description

    GENERAl INfORMATION Unit description Identification R AARIA ONE INVERTER is a dual duct climate control system The unit can be identified through the technical data plate: suitable for wall installation on any perimeter wall. The aesthetic impact is reduced significantly both on the outside where only two 162 mm holes will be visible, and inside the house thanks to a depth of only 170 mm, smaller than conventional indoor climate control units.
  • Page 6: Layout

    GENERAl INfORMATION Layout Control panel Anti-lifting bracket Air outlet deflector 10 Remote control 17 Lower exchanger Front panel Terminal blocks 18 Maximum level float Intake grid 12 Air filter 19 Level float Decorative side panel 13 Room air probe 20 Condensation drain valve External air intake 14 Upper exchanger 21 Four-way valve...
  • Page 7: Technical Specifications

    GENERAl INfORMATION Technical specifications Performance Model Cooling performance [A35 / A27] Capacity at maximum air flow 2,04 Absorbed power at maximum air flow 0,63 3,21 kW/kW Capacity at maximum power 2,60 Power consumption at maximum power 0,81 Average air flow rate capacity 1,75 Power consumption with average air flow rate 0,54...
  • Page 8 GENERAl INfORMATION Energy data Model Ecodesign data and Energy labelling Standby mode (PSb) Thermostat-off mode (PTO) 11,0 2088 Sound power level db(A) Cooling Nominal capacity 2,60 Nominal power input 0,81 3,21 kW/kW Energy class Hourly energy consumption kWh/h Heating Nominal capacity 2,64 Nominal power input 0,80...
  • Page 9: Operating Limits

    GENERAl INfORMATION Operating limits COOlING HEATING A (°C) A (°C) B (°C) B (°C) Outdoor air temperature (b.S.) Outdoor air temperature (b.S.) Indoor air temperature (b.S.) Indoor air temperature (b.S.) Cooling circuit The cooling circuit is of the heat pump type with a refrigerant gas ergy from the outdoor air and delivers it to the room air, thereby reversal cycle.
  • Page 10: Installation

    The Instruction book comes with the equipment and it should be taken, read and kept carefully. The document envelope must be kept in a safe place. Any duplicate must be requested from Riello S.p.A. which re- serves to charge the cost. Model...
  • Page 11: Storage

    INSTAllATION — open the cardboard packaging Lower closing panel — remove the lower closing panel Model Product dimensions 1030 Weight 46,5 Storage The product must be stored of according to the regulations in force. Handling and removal of the packing Polystyrene elements Metal support Paper template and plastic sheets for ducts...
  • Page 12: Place Of Installation

    INSTAllATION Place of installation Recommended distances The location of the R AARIA ONE INVERTER devices must be The distances for the device installation and maintenance are determined by the system’s designer or by another competent shown in the figure. The indicated spaces are necessary in order person, and must take into account technical requirements, as to prevent the airflow from being blocked, as well as to allow well as any current local regulations.
  • Page 13: Positioning

    INSTAllATION — use a drill In the event of a replacement, the system must be inspected by the designer or by another competent person, and must — drill a pilot hole be compliant with the technical requirements, as well as —...
  • Page 14 INSTAllATION fixing the metallic support to the wall: The devices are provided with metallic support for mounting on the wall. Spirit level Metal support Paper template Fixing screw External air intake damper Support wall External air expulsion damper Wall plug —...
  • Page 15: Condensate Discharge Connection

    INSTAllATION 2.10 Condensate discharge connection If using a jug for collecting the condensation: R AARIA ONE INVERTERcomes complete with a pan for col- lecting the condensation that is produced during operation and that must be conveyed to a suitable location for draining. The size and positioning of the drainage tube are shown below.
  • Page 16: Wiring Diagram

    INSTAllATION 2.11 Wiring diagram CN11 CN18 CN17 CN15 CN14 CN10 CN13 XP209 Upper fan motor • Cable colour Control panel blue Room temperature probe (NTC 5.28 kΩ at 25°C) Yellow/green Upper exchanger temperature probe (NTC 5.28 kΩ brown at 25°C) •...
  • Page 17: Electrical Connection

    INSTAllATION 2.12 Electrical connection AARIA ONE INVERTER leaves the factory fully wired and equipped with a cable with Y-type plug for connection to the power sup- ply. To power the unit simply insert the plug into a suitable sock- et protected by a circuit breaker. Main switch Plastic terminal board cover Y-type socket...
  • Page 18: Mounting The Low-Wall Unit

    INSTAllATION Electric connections shall be made in compliance with na- tional regulations. Avoid placing the connection cables less than 1 metre away from radio and video systems. It is forbidden to earth the device together with pipes, lightning conductors or the earthing system of a telephone line.
  • Page 19: Mounting The High-Wall Unit

    INSTAllATION Anti-lifting bracket Plastic terminal board cover Fixing screws Front panel — remove the spacer Decorative side panel — lean the unit against the wall Intake grid — verify the absence of cracks between the rear of the unit and the external air ducts To remove the intake grille: —...
  • Page 20: Controls

    INSTAllATION Keys and symbols 1. Value of the temperature desired 2. Setting value of some functions 3. Alarm code It activates the Heating mode It activates the Cooling mode It activates the Dehumidification mode Anti-lifting bracket Indicates the ambient temperature level from 1 to —...
  • Page 21 INSTAllATION Remote control — press the side tab — extract the battery holder function keys It switches the device on and off — remove the protective film Enables Automatic mode It activates the Cooling mode It activates the Heating mode It activates the Dehumidification mode Increases the value of the selected parameter Decreases the value of the selected parameter...
  • Page 22: Commissioning And Maintenance

    COMMISSIONING AND MAINTENANCE COMMISSIONING AND MAINTENANCE Air flow upwards (factory setting) Preparation for first commissioning Prior to commissioning, it is necessary to check that: — all the safety conditions have been met — all distances have been respected — the electrical connections have been properly completed —...
  • Page 23 COMMISSIONING AND MAINTENANCE — high-wall installation To change the configuration: O F F — use the control panel — hold down for 5 seconds — set the system main switch to “OFF” The symbol dn flashes, air flows upwards. block insert —...
  • Page 24: Putting Into Service

    COMMISSIONING AND MAINTENANCE Putting into service Should any of the above-listed controls have problems: turn the device off and call the Technical Service immediately. After having completed all the operations required to prepare Do not touch the device pipes to prevent potential burns. for first commissioning, do the following to activate the device: Take anti-static precautions in case of weather conditions where humidity is less than 40%.
  • Page 25: Extraordinary Maintenance

    COMMISSIONING AND MAINTENANCE — hydraulic joint status Cleaning the housing and front panel — wet a sponge or soft cloth with water and soap to wash — condensate tray cleaning — once cleaning is over dry surfaces with care — electric absorption —...
  • Page 26 COMMISSIONING AND MAINTENANCE If the fault occurs again, an accurate check of the device fault codes components is required. Contact R Technical Support Code Description Remarks Service. Cooling, Dehumidifying Faults are communicated through a code on the unit’s control and Heating modes panel.
  • Page 27: Disposal

    RECYClING AND DISPOSAl DISPOSAl Packaging materials shall be disposed of separately so as to re- cover and recycle them. At the end of its service life, the device shall be disposed of according to the existing legislation.
  • Page 28 RIELLO S.p.A. - 37045 Legnago (VR) tel. +39 0442 630111 - fax +39 0442 630371 www.riello.it As the manufacturer is constantly improving its products, the aesthetic or dimensional features, the technical data, the equipment and accessories indicated could be subject to variations.

Table of Contents