Carrier AquaEdge 19XR3-E Start-Up, Operation And Maintenance Instructions Manual page 114

Table of Contents

Advertisement

Step 5: Verify that IOT certificate status = "Present".
HMI Path: Main Menu → System Configuration → Network Diagnostic.
If no, the certificate must be loaded to proceed or other HMI must be used.
Step 6: Complete "Ping Test" to Modem. HMI Path: Main Menu → System Configuration → Network Diagnostic.
Type "Modem IP Address" (typically 169.254.1.2) into the "Server Address" of the "Network Diagnostic" menu.
Select "eth0" as the "Interface" and then select "Run PING test". If PIC6 can connect to the modem the "PING Test Status"
will change from "IN PROGRESS to "PASS".
Step 7: Complete "Ping Test" to Internet. HMI Path: Main Menu → System Configuration → Network Diagnostic.
Type 8.8.8.8 into the "Server Address" of the "Network Diagnostic" menu. Select "eth0" as the "Interface" and
then select "Run PING test". If PIC6 can connect to the internet the "PING Test Status" will change from "IN
PROGRESS to "PASS".
Passed Ping Test:
If no, call Smart Service Command Center.
Step 8: Complete "Cloud Test". HMI Path: Main Menu → System Configuration → Network Diagnostic
Select "Run CLOUD Test". If PIC6 can connect to the modem the "Cloud Test Status" will change from
"IN PROGRESS to "PASS".
Passed Cloud Test:
If no, call Smart Service Command Center.
DESIGN CONDITIONS:
TONS
BRINE
COOLER
CONDENSER
COMPRESSOR:
Volts
STARTER:
Mfg
OIL PUMP:
Volts
CONTROL PANEL SUPPLY:
REFRIGERANT: Type
CARRIER OBLIGATIONS:
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions . . . . . . . . . . . . . . . . . . .Yes
2. Machine Assembly, Wiring and Piping Diagrams . . . . . .Yes
3. Starting Equipment Details and Wiring Diagrams . . . . . .Yes
4. Applicable Design Data (see above) . . . . . . . . . . . . . . . .Yes
5. Diagrams and Instructions for Special Controls. . . . . . . .Yes
INITIAL MACHINE PRESSURE:
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
FLOW
TEMPERATURE
TEMPERATURE
RATE
IN
RLA
Type
RLA
Voltage __________
Charge
Assemble . . . . . . . . . . . . . . . . . . . Yes
Leak Test . . . . . . . . . . . . . . . . . . . Yes
Dehydrate . . . . . . . . . . . . . . . . . . Yes
Charging . . . . . . . . . . . . . . . . . . . Yes
Operating Instructions
Yes
No
Yes
No
Yes
No
(Y/N) ____
(Y/N) ____
(Y/N) _____
PRESSURE
PASS
OUT
DROP
OLTA
S/N
OLTA
Hertz ________
No
No
No
No
Hrs.
No
No
No
No
No
CL-2
SUCTION
CONDENSER
TEMPERATURE
TEMPERATURE
******
******

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquaedge 19xrAquaedge 19xr6Aquaedge 19xr7

Table of Contents