Request For Initial Startup; Axm Air-To-Water Heat Pump - Trane Thermafit AXM Installation, Operation And Maintenance Manual

Modular air-to-water heat pump
Table of Contents

Advertisement

Appendix A. Request for Initial Startup
AXM Air-to-Water Heat
Pump
As part of a continuous commitment to quality, initial start-
up of this heat pump by a factory-certified technician may
be purchased from Trane. No initial start-up will be
scheduled without a Request for Initial Start-Up form
completed and on file with the Trane customer service
Model Number:
Primary Contact Name:
Primary Contact FAX:
Name of Heat Pump Site:
Physical Location of Heat Pump:
Requested Date for Initial Start-Up:
Requested Time for Initial Start-Up:
Mandatory Initial Start-Up Requirements
All heat pump modules are installed with minimum clearances available from all sides.
Refrigeration gauges are indicating equal pressures.
Chilled water lines from heat pump to customer's equipment are permanently connected.
Chilled water lines have been flushed clean of mud, slag, and other construction debris.
All chilled water line filters and strainers are clean.
Chilled water lines have been leak tested according to prestart instructions.
Heat Pump reservoir (if included) is at operating level with correct water/glycol mixture.
High voltage wiring is installed, tested, and functional.
All water, refrigeration, electrical, and control connections between heat pump modules are completed.
All control wiring between modular heat pumps is installed, tested, and functional.
Control wiring is complete, including any remote interface panel or special-purpose module wiring.
Automatic City Water Switchover (if included) is installed, flushed, and leak-tested.
Condenser, if applicable, is installed, piped, wired, and leak-tested.
All responsible installing contractors and sub-contractors are notified to have representatives available
on site to provide technical support for the initial start-up procedure.
Full load is available for heat pump on the initial start-up date.
ARTC-SVX009A-EN
Mandatory Tasks
department. Submitting this form indicates that all critical
work described on the form has been completed. To
prevent additional charges for aborted start-ups, the
following items must be completely functional and
operating and this form signed and returned to Trane at
least 10 working days prior to the scheduled initial start-up
date.
Heat Pump Initial Start-Up Data
Primary Module Serial Number:
Primary Contact Phone:
Primary Contact Mobile:
Date Completed
Completed By
(Initials)
A–1

Advertisement

Table of Contents
loading

Table of Contents