Blowing Through The Gauge For Further Cleaning; Cleaning The Glasses - Igema LG40-CS Installation And Operating Instructions Manual

Reflex level gauge
Table of Contents

Advertisement

9.3 Blowing through the gauge for further cleaning

▪ The gauge must be depressurised
Figure 1
Open the upper shut-off valve slowly.
The steam flowing through cleans the glasses.
Figure 2
Close the upper shut-off valve
Close the drain valve.
The gauge can be put back into operation.

9.4 Cleaning the glasses

Figure 1
▪ The gauge must be depressurised
• Unscrew the screw plug
• Clean glasses and channel in the display body with a round brush
.
00775)
Figure 2
• Screw in the screw plug
T
IP
If this cleaning is not sufficient, a new glass
packages and article numbers, see Chap.11.1)
D-02-B-51105-EN-02
Fig.1
(chap. 9.2)
Fig.1
(chap. 9.2)
.
(pos. 1)
with torque Md=120Nm.
(Pos.1)
Fig.2
(Ch.8)
Fig.2
must be installed.
(item 5)
S
ERVICING
(Article number 40-
(For spare parts
Page / 21

Advertisement

Table of Contents
loading

Table of Contents