PureFire
This conversion kit shall be installed by a qualified installer, service agency, or the gas supplier in accordance with
the manufacturer's instructions and all applicable codes and requirements of the authority having jurisdiction. If
the information in these instructions is not followed exactly, a fire, an explosion, or production of carbon monoxide
can result causing property damage, personal injury, or loss of life. The qualified installer, service agency, or the gas
supplier is responsible for the proper installation of this kit. The installation is not proper and complete until the
operation of the converted appliance is checked as specified in the manufacturer's instructions supplied with the kit.
If the information in these instructions is not followed exactly, a fire, an explosion or production of carbon
monoxide may result causing property damage, personal injury or loss of life.
Stop! Read these instructions or warranty will be void!
ITEMS REQUIRED FOR CONVERSION
• "Valve Converted to LP" Label (9349, included)
• "Valve Converted to Natural Gas" Label (9350, included)
• Boiler Conversion Label (9486, included)
• Flat Blade Screwdrive
• Combustion Analyzer with Carbon Dioxide and Carbon
Monoxide Reading Capability (Testo 325-M or equivalent)
• 21/64" Drill
• 1/8" NPT Tap and plug (PVC and CPVC venting only)
The boiler conversion must be done by a qualified installer or
service technician in accordance with these instructions and
must meet all local codes and requirements of the authority
having jurisdiction. The qualified installer or technician
performing this work assumes full responsibility for this
conversion.
It is important that you follow the conversion procedure in the
proper sequence. We have enclosed for your convenience three
conversion labels, one of which will be attached to the inside of
the boiler and one which will be placed near the rating label on
the outside of the boiler. One will not be used.
⚠
WARNING
It is very important that you carefully follow the
instructions below correctly. Death or serious injury
could result.
Note: Failure to do so will void your warranty.
STEP 1
Turn off all power to the unit. Shut the gas off with the
manual shutoff valve. Make sure that the gas supply is
connected. Check gas pressure and gas piping to assure
proper sizing to the boiler firing rate.
If connected to LP gas, it is recommended that you contact
your gas supplier to size the piping and the tank. It may also
be necessary to install a 100% lockup gas pressure regulator
of sufficient capacity to supply an adequate gas flow.
1
Gas Conversion Instructions
®
for Propane or Natural Gas
⚠
⚠
WARNING
WARNING
Figure 1
STEP 2 - PVC & CPVC ONLY
Drill and tap a 21/64" diameter, 1/8" NPT hole into exhaust
piping 1 foot from unit to be used as a test port for the
combustion analyzer. See Figure 2.
Figure 2
Need help?
Do you have a question about the PureFire and is the answer not in the manual?
Questions and answers