Page 1
ATD009 - OO (1:76 Scale) Stone Mill - Instruction Manual Tools Required Modellers Knife (with a fresh blade) Cutting Mat Modelling Glue (we recommend Deluxe Materials Roket Card Glue) Fine Tip Applicator Low-tac Masking Tape Clips / Clamps Tips Prior to starting your build, we recommend reading through the instructions to familiarise yourself with the build style of the kit.
Page 2
1. Detach Wall A and place it face down on your work surface. Then fold the tabs over on themselves and glue. Repeat this step for Wall B. Apply firm pressure on the tabs until the glue is semi cured to stop them from lifting. 2a.
Page 3
4. Fold the tabs on Wall C inwards by 90 5. Detach Wall G and glue it to Wall C. Repeat degrees. Repeat this step for Wall D. this step for Wall H and D. Ensure there is an even gap between the crease lines and the edge of the walls.
Page 4
8a. Now turn the building on its side. Detach the Ground Floor and glue it into the building. You will notice that there are notches cut out in the wall that will align with the tabs on the floor like a jigsaw. You may find it easier to apply glue inside the notches before positioning the tabs.
Page 5
10. Detach the roof. Next, locate the glazing sheet 11. Apply a bead of glue to the tops of each and cut out the sky lights (x6). Then, apply a wall. Then fold the roof along the crease small amount of glue to each window and line and position it on top of the building.
Need help?
Do you have a question about the ATD009 and is the answer not in the manual?
Questions and answers