LG PREMTC00U Owners & Installation Manual page 245

Simple wired remote controller
Table of Contents

Advertisement

F
MULTI
F
MAX
MULTI
Outdoor Unit Platform Requirements
Figure 44: outdoor unit Foundation Requirements.
Unit: Inch
lMu187HV and lMu247HV outdoor units
table 162: Outdoor Unit Foundation Specifications.
outdoor unit type
Bolt type
lMu187HV, lMu247HV,
M10-J
lMu369HV
lMu540HV
M10-J
Bolting the Outdoor Unit to the Platform
1. ensure that the concrete platform will not degrade easily, and has enough
strength to bear the weight of the unit.
2. include an H-beam support. Firmly attach the corners, otherwise the support
will bend.
3. use a hexagon nut.
4. use anti-vibration material.
5. include enough space around the concrete foundation for condensate
drainage.
6. seal all wiring and piping access holes to prevent bugs from entering the unit.
Concrete Platform Specifications
• concrete foundations should be made of one part cement, two
parts sand, and four parts gravel.
• the surface of the foundation should be finished with mortar with
rounded edges, and weatherproofed.
PlACEmEnt ConSiDErAtionS
concrete Height
Minimum 3-15/16 inches
Minimum 2-3/4 inches
Minimum 7-7/8 inches
Minimum 2-3/4 inches
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
lMu369HV outdoor units
Bolt depth
Figure 45: Bolting the outdoor unit to the platform.
Bolt
Bolt
Figure 46: close up of Bolt Attachment.
Anchor Bolt
M10
lMu540HV outdoor units
Refrigerant Pipe
Bolt
Connection Location
Top of Outdoor Unit
(Looking Down)
Bolt
ApplicAtion Guidelines | 193
Unit: Inch
13/16
Unit: Inch

Advertisement

Table of Contents
loading

Table of Contents