Maintenance - Husqvarna CL400 Operator's Manual

Cable layer
Hide thumbs Also See for CL400:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
2. Move the cable guide up a few millimeters.
3. Tighten the 2 screws.
To adjust the track width
The position of the wheels can be adjusted for different
track widths. There are 4 adjustment holes in the axle on
the left side and 4 adjustment holes in the axle on the
right side. The track width can be adjusted at 250, 270,
290 or 310 mm from the center of the drill.
(Fig. 29)
1. Pull out the pin (A).
2. Adjust the wheels to the necessary track width.
3. Put the pin in one of the 4 holes (B) in the axle.
4. Lock the safety spring.
To start the work
After the cable and the drill are installed, the operator
need to fix the cable to the ground.
1. Put a stake into the ground.
2. Fasten the part of the cable that comes out from the
bottom of the cable guide to the stake.
To use the 2-cable guide
If the product goes away from the outer perimeter of the
work area, it is necessary to put 2 cables at the same
time.
1. Plough down 1 cable along the entire perimeter.
Refer to figure (A) and (B). (Fig. 30) (Fig. 31)
2. When you are at the point shown in figure (C), put
the support wheel in the highest position to remove
the feeding fin from the soil. Attach the cable with a
stake and continue with the cable above the soil until
you are the next point. (Fig. 32)
3. Attach the cable with a stake at the point shown in
figure (D). (Fig. 33)
Introduction
WARNING:
maintenance, you must read and
understand the safety chapter.
For all servicing and repair work on the product, special
training is necessary. We guarantee the availability of
professional repairs and servicing.
Do a general inspection.
Make sure that the safety devices on the product are not defective *.
1394 - 003 - 05.12.2023

Maintenance

Before you do
4. Put the feeding fin in the correct cable laying depth
and continue to plough the cable to create the island.
Refer to figure (E). (Fig. 34)
5. When you reach the point indicated in the figure (F),
remove the stake and clean the feeding fin. Refer to
To clean the feeding fin on page 14 . (Fig. 35)
6. Assemble the cable above ground in the cable
guide. (Fig. 36)
7. Plough the 2 cables at the same time to the point
shown in figure (G). Attach the 2 cables to a stake
and disconnect the second cable from the cable
guide. (Fig. 37)
8. Continue to plough the perimeter cable to the point
shown in figure (H). (Fig. 38)
To stop the product
The product stops automatically if you do not operate it
for 3 minutes.
1. Release the drive bail (A) to disengage the drive on
the wheels. (Fig. 22)
2. Release the drill operation bail to stop the drill. (Fig.
15)
3. Switch off the engine.
4. Push the throttle control to STOP position.
5. If the engine is equipped with a stop switch, move
the stop switch to the stop position after the engine
rotation become idle.
6. Close the fuel tap, if equipped.
7. Use the scraper to clean the feeding fin. Refer to
clean the feeding fin on page 14 .
8. Clean and lubricate the drill head after each
To clean and lubricate the drill
operation. Refer to
head on page 14 .
For more detailed information, refer to .
Maintenance schedule
The maintenance intervals are calculated from daily use
of the product. The intervals change if the product is not
used daily.
For maintenance identified with *, refer to
page 9 .
Each
use
X
X
Safety on
After
Each
After 8h
25h
season
To
13

Advertisement

Table of Contents
loading

Table of Contents