Installation Requirements; Electrical; Gas - Bertazzoni Professional Series Installation, User And Maintenance Manual

Freestanding dual fuel ranges, gas worktop, electric manual clean
Hide thumbs Also See for Professional Series:
Table of Contents

Advertisement

INSTALLATION REQUIREMENTS

installation area for the connection
16

ELECTRICAL

A
properly-grounded
receptacle should be installed no higher than 3" (7.6 cm)
above the floor, no less than 2" (5 cm) and no more than 8"
(20.3 cm) from the left side (facing product).
Check all local code requirements.

GAS

An agency-approved, properly-sized manual shut-off valve
should be installed no higher than 3" (7.6 cm) above the
floor and no less than 2" (5 cm) and no more than 8" (20.3
cm) from the right side (facing product).
Fig. 5
To connect gas between shut-off valve and regulator, use
agency-approved, properly sized flexible or rigid pipe.
Check all local code requirements.
Fig. 6
horizontally-mounted
electrical

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mas305dfmnevMas305dfmbivMas305dfmxvPro305dfmxv

Table of Contents