UPS5000-H-1200 kVA-NTN
Quick Guide (480 V, 100 kVA Power Modules)
Figure 1-59 Installing transfer copper bars
----End

1.8.2 Bottom Cable Routing

Step 1 Remove the connecting kits and covers from both sides of the top of the bottom
cabling cabinet.
Figure 1-60 Removing cabinet connecting kits
Step 2 Remove the transfer copper bars for battery cable connection.
Figure 1-61 Removing battery copper bars
Step 3 Install epoxy boards (No. 1 to 8).
Issue 01 (2023-03-20)
Copyright © Huawei Technologies Co., Ltd.
1 Installation and Cable Connection
52