Connecting The Iq Sensor Et Modules; Ensor Net; Preparing The Turbidimeter For Operation; Connecting The Turbidimeter To The Miq/Ic2 Module - Xylem wtw DW/P Operating Manual

Table of Contents

Advertisement

Installation
18
6.
Securely fasten the drinking water panel.
Make sure that the drinking water panel does not bend.
3.2.4
Connecting the IQ S
Any modules included in the scope of delivery (e.g. MIQ/IDS) have to be
connected with the IQ S
module stack is the simplest way of connecting the IQ S
For details on the connection of IQ S
manual IQ S
N
ENSOR
3.2.5

Preparing the turbidimeter for operation

General information on commissioning (see operating manual of the
turbidimeter).
For initial commissioning:
1.
Remove the desiccant pouch from the cell of the turbidimeter and dis-
pose of it.
2.
Insert the enclosed desiccant pouch into the base of the instrument (see
operating instructions for turbidimeter)
3.2.6

Connecting the turbidimeter to the MIQ/IC2 module

Measuring instruments that have a current output can be connected to the
IQ S
N
with the MIQ/IC2 module.
ENSOR
ET
Cables with a diameter of 5.8 mm to 10 mm are suitable for con-
necting the turbidimeter to the MIQ/IC2 module (see MIQ/IC2 and
turbidimeter operating manuals)
1.
Connect the current output on the turbidimeter to the current input on
the MIQ/IC2 module.
Guide the cable of the power supply through the cable opening of the
drinking water panel.
N
modules
ENSOR
ET
N
. In most applications, the connection as a
ENSOR
ET
ENSOR
.
ET
ENSOR
N
modules, see system operating
ET
ba77278e01
DW/P
N
modules.
ET
01/2024

Advertisement

Table of Contents
loading

Table of Contents