Steps For Installation - Xylem wtw DW/P Operating Manual

Table of Contents

Advertisement

DW/P
ba77278e01
3.2.2

Steps for installation

1.
Install the drinking water panel
(see section 3.2.3 M
2.
Connect any IQ S
(see section 3.2.4 C
3.
Prepare the turbidimeter for operation
(see section 3.2.5 P
4.
Connect the turbidimeter to the MIQ/IC2 module
(see section 3.2.6 C
)
ULE
5.
Supply the components with power
(see section 3.2.7 I
6.
Install the chlorine sensor into the D 19 flow through armature
(see section 3.2.8 I
FLOW THROUGH ARMATURE
7.
Install the sensor into the D 17 flow through armature
(see section 3.2.9 I
ARMATURE
8.
Connect the sensors to the MIQ/IDS module
(see section 3.2.10 C
).
ULE
9.
Connection of the inlet and outlet
(see section 3.2.11 C
10.
Tidy up the cables
(see section 3.2.12 T
11.
Provide the sample flow
(see section 3.2.13 P
12.
Starting the measuring operation
(see section 3.3 S
01/2024
OUNTING OF THE
N
modules
ENSOR
ET
ONNECTING THE
REPARING THE TURBIDIMETER FOR OPERATION
ONNECTING THE TURBIDIMETER TO THE
NSTALLING THE POWER SUPPLY
NSTALLING THE CHLORINE SENSOR INTO THE
).
NSTALLING THE SENSOR IN THE
).
ONNECTING THE SENSORS TO THE
ONNECTION OF SAMPLE OUTLET AND SAMPLE INLET
IDYING UP THE CABLES
ROVIDING SAMPLE FLOW AT THE SAMPLE INLET
TARTING THE MEASURING OPERATION
DW/P
DRINKING WATER PANEL
IQ S
N
ENSOR
ET MODULES
).
D 17
FLOW THROUGH
MIQ/IDS
).
).
Installation
).
).
)
MIQ/IC2
-
MOD
D 19
-
MOD
).
).
15

Advertisement

Table of Contents
loading

Table of Contents