Installing The Power Supply - Xylem wtw DW/P Operating Manual

Table of Contents

Advertisement

DW/P
ba77278e01
3.2.7

Installing the power supply

Installation activities for the power supply may only be performed by a qualified
electrician:
The following components have their own power supply:
 Turbidimeter
 IQ S
N
ENSOR
ET
The IQ S
IQ S
ponents in the IQ S
supply modules needed.
For the power supply of the IQ S
of the drinking water panel, one module with power supply is suf-
ficient.
To supply more components of the IQ S
a power rating is required. This determines the number of power
supply modules required (see system operating manual of the
IQ S
For details on the installation of the power supply, see the operating manuals of
the components.
1.
Connect the power supply for the turbidimeter
(see operating manual for the turbidimeter). Guide the cable of the
power supply through the cable opening of the drinking water panel.
2.
Connect the power supply for the IQ S
(see operating manual for the power supply module or operating man-
ual of the DIQ/S 28X).
Guide the cable of the power supply through the cable opening of the
drinking water panel.
01/2024
N
supplies the components of the
ENSOR
ET
N
with power. The power requirement of all com-
ENSOR
ET
ENSOR
N
).
ENSOR
ET
N
determines the number of power
ET
N
within the framework
ENSOR
ET
ENSOR
N
ENSOR
ET
Installation
N
with power,
ET
19

Advertisement

Table of Contents
loading

Table of Contents