Ehv Installation (Option) - Efco SWAPLOADER SL-222 Parts And Operation Manual

Table of Contents

Advertisement

 
1. Review all directions and diagrams provided before starting the Electric over Hydraulic Valve
Installation. 
 
2. Mount the 22P62 EHV to the hoist's
Main Frame and attach all hoses, hose
clamp assemblies and fittings as
shown on Pg. 6-7 (also see
Illustrations).
 
NOTE:
THE FIGURES BELOW DO NOT NECESSARILY
DEPICT YOUR HOIST AND ARE ONLY MEANT
TO ILLUSTRATE ROUTING OF THE HYDRAULIC
LINES FROM THE VALVE TO THE CYLINDERS
2.0.INS.SL-222

EHV INSTALLATION (OPTION)

Electric Over Hyd. Valve - SERVICE PARTS
PART
ITEM
#
1
13P36
2
13P37
3
13P40
4
13P41
5
22P82
6
22P83
7
22P85
8
22P88
Section II: Installation 
QTY
DESCRIPTION
1
Hose Assy 83.5 08-08FJ/08FJ45
Hose Assy 86 08-08FJ/08FJ45
1
1
Hose Assy 28 08-08FJ/08FJ
Hose Assy 33 08-08FJ/08FJ
1
1
Solenoid Operated Valve, Motor
Solenoid Operated Valve, Cyl.
1
1
Dump Valve
Relief Valve Cartridge (2800)
1
SL-222
2-7

Advertisement

Table of Contents
loading

Table of Contents