The installation of the SwapLoader on a truck chassis will generally follow these steps:
1. Install hoist assembly onto truck chassis.
2. Mount the hydraulic control valve or EHV system to the hoist and install the hydraulic
plumbing from the control valve to the hydraulic cylinders. Then install the control levers in
the cab and route the control cables to the hydraulic control value assembly.
3. Install the hydraulic tank, hydraulic filter, and hydraulic plumbing between the hydraulic tank
and the control valve assembly.
4. Select and install the P.T.O. on the truck transmission. (Note: This can be done prior to
hoist installation on the truck chassis.)
5. Install the hydraulic pump and the plumbing from the pump to the hydraulic tank and control
valve assembly.
6. Fill the hydraulic tank with oil, bleed the air from the pump suction line, and start up the unit.
Although SwapLoader attempts to include the mounts and attaching fasteners with each hoist
unit, your installation may require some additional mounts or modifications. If you have
problems with your installation, please contact SwapLoader at 1-888-767-8000, as we may be
aware of another customer who has installed a SwapLoader on a similar truck chassis.
2.0.INS.SL-222

INITIAL INSPECTION

When the hoist is installed and ready for delivery, it is
your responsibility to fill out and submit the Product
Registration Form. Visit
https://www.swaploader.com/warranty-registration/
complete this form.
 When the SwapLoader hoist is received from the factory,
you should inspect the hoist for damage, which may have
occurred in shipment. If damage has occurred, you
should contact the shipper immediately. Be sure to note
any damage or missing items on bill of Lading.
When you receive your SwapLoader hoist, it is your
responsibility to make sure you have received all the parts
and pieces that were ordered, within 30 days of the
invoice date of the hoist. Lay out all the options, loose
parts and accessories on a table and compare the items
received vs the Packing List and the Loose Parts Box
List(s) shipped with the hoist order.
If you have any problems, shortages, or questions, please
contact SwapLoader U.S.A., Ltd. immediately.

GENERAL INSTALLATION PROCEDURE