Installation Overview; Preparing The Ap For Installation - Cisco C9124AXE-E Installation Manual

Table of Contents

Advertisement

Installation Overview

Installing an AP involves the following high-level tasks.

Preparing the AP for Installation

Before you mount and deploy the AP, we recommend that you perform a site survey (or use the site planning
tool) to determine the best location to install your AP.
You should have the following information about your wireless network on hand:
• AP locations
• AP-mounting options: To a vertical or horizontal wall or pole
Note
The AP can be mounted in various orientations. Depending on the orientation, you may have to purchase
additional mounting hardware. For more information, see
• AP power options: 802.3at (PoE+), 802.3bt, and Cisco Universal PoE (Cisco UPOE)
Note
When you use 802.3af to power an AP, both the 2.4-GHz and 5-GHz radios are disabled, and the Ethernet
gets downgraded to 1–GbE speeds. The SFP port and PoE-OUT are also disabled.
• Operating temperature:
Preparing the AP for Installation, on page 35
Performing a Preinstallation Configuration (Optional), on page 36
Mounting the Access Point, on page 38
• C9124AXI: -40° to 149℉ (-40° to 65℃) and 131℉ (55℃) with solar loading
• C9124AXD: -40° to 149℉ (-40° to 65℃) and 131℉ (55℃) with solar loading
• C9124AXE: -40° to 149℉ (-40° to 65℃) and 131℉ (55℃) with solar loading
Cisco Catalyst 9124AX Series Outdoor Access Point Hardware Installation Guide
4
C H A P T E R
Mounting the Access Point, on page 38
section.
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 9124ax series

Table of Contents