Cisco C9124AXE-E Installation Manual page 64

Table of Contents

Advertisement

Wall Mounting the AP with Horizontal Kit
Figure 63: Wall mount L-bracket screw hole dimensions
Figure 64: L-bracket AP mount dimensions
Step 2
Use four screws and, if required, wall anchors to attach the L-bracket to the mounting surface. You must
procure these screws and anchors, and they must follow local codes to support at least 50 lbs (22.7 kg.)
Step 3
Position the AP horizontally against the L-bracket's bottom to align the four mounting holes on the AP's back
with the slots in the mounting bracket.
Note
Step 4
Screw an M6 x12–mm bolt into each of the four support bolt holes on the back of the AP by hand. Do not
tighten the bolt completely. Leave it loose to slide in the bracket slot.
Step 5
Ensure that the AP and all attached cables have clearance to install and provide drip loops.
Step 6
Tighten the four M6 bolts to 40–lbf-in (4.5 Nm) torque using a 10–mm wrench.
Step 7
Position and install the solar shield on top of the L-bracket and AP. Align four holes in the shield to mount
holes in AP. Insert four #8-32 screws through the shield into AP. Torque tighten the screws to 15 lbf-in (17
kgf-cm).
Note
Cisco Catalyst 9124AX Series Outdoor Access Point Hardware Installation Guide
56
The AP has additional mounting holes to be positioned and located to best accommodate on site
cabling. Ensure to review before mounting the AP to the bracket.
We recommend you install the solar shield. However, if the AP's installed location is shaded from
the sun (For example: indoors or under an eave), the solar shield is not required.
Installation Overview

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 9124ax series

Table of Contents