07
Equipment Commissioning
Parallel System
When power on the parallel system, make sure that all the AC breakers of the slave inverters are
powered on within one minute after powering on the AC breaker of the master inverter.
PV string
5
Battery
Battery
breaker
PV string
5
Battery
Battery
breaker
PV string
5
Battery
Battery
breaker
Turn on:
Master
inverter
6
BACK-UP AC breaker
Slave
inverter 1
6
BACK-UP AC breaker
Slave
inverter n
n≤5
6
BACK-UP AC breaker
6
Only for
Australia.
5
6
WARNING
1
ON-GRID AC breaker
2
3
ON-GRID AC breaker
4
3
ON-GRID AC breaker
4
50