Electrical Connection; System Wiring Diagram - GE GEH User Manual

15-30kw three phase
Table of Contents

Advertisement

User Manual
V1.0-2023-10-30
6

Electrical Connection

6�1 System Wiring Diagram
N and PE wiring via ON-GRID and BACK-UP ports of the inverter are different based on
the regulation requirements of different regions. Refer to the specific requirements of local
regulations.
There are built-in relays inside of the inverter's ON-GRID and BACK-UP AC ports. When the
inverter is in the off-grid mode, the built-in ON-GRID relay is open; while when the inverter is in
grid-tied mode, it is closed.
When the inverter is powered on, the BACK-UP AC port is charged. Power off the inverter first if
maintenance is required for the loads connected with BACK-UP ports. Otherwise, it may cause
electric shock.
N and PE cables are connected together in the Main Panel for wiring�
To maintain neutral integrity, the neutral cable of ON-GRID side and BACK-UP side must be
connected together, otherwise BACK-UP function will not work.
The following diagram is applicable to areas in Australia, New Zealand, etc.
Inverter
BAT
Battery
BMS
PV
PV string
L1
L2
L3
BACK-UP
N
Do not wire in this position if N
PE
or
and PE cables are connected
together.
Meter
L1
L2
L3
ON-GRID
N
PE
PE
NOTICE
NOTICE
Main panel
Smart
Meter
CT1
CT2
CT3
N-BAR
RCD
L1 L2 L3
N
PE
Normal loads
31
06
Electrical Connection
L1
L2
L3
RCD
BACK-UP
N
Loads
PE
L1
L2
Utility grid
L3
N
PE
E-N Link
E-BAR