12 SERVICE WORK ON THE CHASSIS
12.15
12.16
68
Lubricating the steering head bearing
H02387-01
Removing the front fender
V00340-10
Guideline
Screw, top triple
clamp
(All EXC‑F SIX DAYS models)
–
1
Tighten screws
.
Guideline
Screw, top triple
clamp
–
2
Tighten screw
.
Guideline
Screw, top steering
stem
Finishing work
–
Check the steering head bearing for play. (
–
Remove the motorcycle from the lift stand. (
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
Info
The steering head bearing is cleaned and lubricated in
the course of removal and installation of the lower triple
clamp.
Preparatory work
–
Remove the headlight mask with the headlight. (
Main work
–
1
Remove screws
.
M8
20 Nm
(14.8 lbf ft)
M8
17 Nm
(12.5 lbf ft)
M8
20 Nm (14.8 lbf ft)
p. 67)
p. 60)
(
p. 64)
(
p. 65)
p. 115)