Camus Hydronics Valiant-FT II Series Installation And Service Manual page 28

Gas fired commercial condensing stainless steel boilers
Table of Contents

Advertisement

VA(H,W) Lead lag Operation
Master Boiler
Description
Master boiler lead lag
setup
Modulates on system
sensor connected to
master boiler
System temperature
sensor must be
connected to boiler
#1.
Outdoor temperature
sensor must be
connected to boiler
#2.
Electrical Connection(s)
Programming Instructions
1)
Place toggle switch to LOCAL
2)
Press
and
3)
Select System Identification & Access
4)
Verify MB1 Modbus address = 1
5)
Verify MB2 Modbus address = 1
6)
Select Lead Lag Master Configuration
7)
Select Master Enabled = Enabled
Fixed Setpoint operation
8)
Enter CH Setpoint (Fixed setpoint)
4-20mA/ 0-10Vdc setpoint operation
9)
Select [Advanced Settings >]
10) Press the
to arrive at Central Heat
11) Select Setpoint Source = S2 (J8-6) 4-20mA
12) Select 4mA water temperature
13) Select 20mA water temperature
14) Select Lead Lag Slave Configuration
15) Select Slave enabled = Enable slave for built-in Lead Lag master
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Va400Va850

Table of Contents