Download Print this page

Troubleshooting And Maintenance - Elkay 4420BFDB Owner's Manual

Bi-level tubular bottle filler fountain w/dog bowl

Advertisement

1. This fountain is to be mounted on a smooth, flat, finished surface with adequate support structure. NOTE: Mounting structure must be
capable of supporting 300 lb. load on fountain.
2. Refer to rough-in for plumbing.
3. Install shut-off valve on water supply. (Valve not furnished)
4. Locate and install fountain using 3/8" minimum screws or bolts. (Screws or bolts not furnished)
5. Prior to installing the bottle filler to the center mounting position of fountain, insert the drain pipe (Item #15) by positioning the short
end of drain pipe through mounting plate of bottle filler. Install bottle filler to fountain and secure with supplied hardware.
6. Prior to installing the bottle filler to the arm mount of fountain, insert the drain pipe (Item #14) into the arm tunnel and adjust drain to
lean to the left side of the armwhen facing the button. Install bottle filler to arm being sure drain tube is above mounting plate of filler.
Install filler to fountain and secure with supplied hardware.
7. Connect water supply and fountain drain. Connect drain waste "Tee" to fountain drain tubes. Connect outlet of "Tee" to drainage
system. Water connection and drain must comply with local codes.
8. Turn on water supply and check all connections for leaks.
CAUTION: This fountain is rated for inlet water pressure of 20-105 PSI. A pressure reducing regulator should be used if the inlet water
supply exceeds 105 PSI. Any damage caused by reason of connecting this product to supply line pressures lower than 20
9. Water supply 3/8" O.D. unplated copper tube. Waste 1-1/2" IPS. Contractor to supply waste trap and service stop valve in
accordance with local code.
10. Connecting lines to be made of unplated copper and should be thoroughly flushed to remove all foreign matter before being con
nected to fountain. This fountain is manufactured in such a manner that it does not in any way cause taste, odor, color, or sediment
problems.
11. Connect fountain to supply line with a shut-off valve and install a 3/8" unplated copper water line between the valve and the cooler.
Remove any burrs from outside of water line. Push the tubes straight into the fittings until they reach a positive stop, approximately
3/4" (See Fig. 2). DO NOT SOLDER TUBES INSERTED INTO PLASTIC FITTINGS AS DAMAGE TO THE O-RINGS MAY
RESULT.
Actuation of Quick Connect Water Fittings:
Fountain is provided with lead-free connectors which utilize an
o-ring water seal. To remove tubing from the fitting, relieve water
pressure, push in on the gray collar while pulling on the
tubing.(see Fig.2) To insert tubing, push tube straight into fitting
until it reaches a positive stop, approximately 3/4".
FIG. 2
3/8" O.D. UNPLATED
1/4" O.D. TUBE
COPPER TUBE CONNECT
WATER INLET
COLD WATER SUPPLY
TO COOLER
NOTE: WATER FLOW
DIRECTION
FIG. 1
4420BFDB FOUNTAIN
TROUBLE SHOOTING AND MAINTENANCE
BUILDING WATER INLET
SERVICE STOP
(NOT FURNISHED)
FIG. 3
STREAM HEIGHT ADJUSTMENT:
Stream height is factory set at 35 PSI. If supply
pressure varies greatly from this, insert a small straight
bladed screwdriver through the access hole in the
center of the push button and turn the adjustment
screw. Clockwise adjustment will raise the stream and
counterclockwise adjustment will lower the stream. For
best adjustment, the stream should be approximately
1 1/2" above the top of the bubbler . (See Fig. 3)
PAGE 5
98645C (Rev. B - 3/11)

Advertisement

loading

This manual is also suitable for:

4420bf2db4420bf1ldb4420bf1udb