PE point
Upper-layer
management
EPO button
EPO button
system
Upper-layer
management system
One End
Cable
Recommended
No.
Bolt/
Protocol
Type
Component
Port
Cable Diameter
Torque
2
(mm
)
PE
M12x40
1
SmartLi
PE
70
cable
47 N· m
M12x40
120 (The
BAT+
47 N· m
load of a
single
M12x40
N
47 N· m
battery
cabinet is
less than or
equal to
DC
150 kW.)
power
2
SmartLi
150 (The
cable
load of a
M12x40
single
BAT-
47 N· m
battery
cabinet is
greater
than 150
kW.)
3
SmartLi1 PARALLEL1
-
-
4
SmartLi1 PARALLEL2
-
-
Modbus-
5
RS485
-
-
RTU
-
-
HTTPS
Comm
unicati
Monitoring
6
FE
ons
interface
cable
unit of the
Modbus-
SmartLi
-
-
TCP
7
Modbus-
COM
-
-
RTU
8
EPO
-
-
Appearance
Pin
COM Port
RS485 Port
1
RS485_T+
RS485_T+
2
RS485_T–
RS485_T–
3
-
-
4
RS485_R+
RS485_R+
5
RS485_R–
RS485_R–
6
GND
GND
7
-
-
8
-
-
The following figure shows how to connect a communications cable between the
SmartLi and the integrated UPS (COM: 6 pins).
Communications cables between the SmartLi and other UPS models (COM: 8 pins)
are connected using standard network cables.
If more than eight SmartLi cabinets are connected in parallel, a maximum of four
15 m parallel communications cables are supported.
EPO button
The Other End
Port
Component
Protective
-
PE
earthing (PE)
point
-
BAT+
-
N
1
Clean the cabinet and
ensure that there is
no foreign matter,
dust, or scraps in the
UPS
cabinet.
-
BAT-
-
PARALLEL2
SmartLi2
-
PARALLEL1
SmartLi3
RS485 port on
the upper-layer
Third-party NMS
management
system
Network port
on the upper-
layer
WebUI
3
Install battery modules.
management
system
Full-capacity cabinet
Network port
ECC800-Pro
scenario (8+8)
on the upper-
NetEco
layer
management
Third-party NMS
system
COM1/COM2/
UPS
COM_OUT
-
-
EPO button
For W1 and W2, use any set of twisted-pair
cables and remove any excess wires. The same
goes for W3 and W4. Other redundant core
wires are cut off.
The cable colors in the figure are for reference
only. The actual cable colors may vary.
Installing Battery Modules
2
Pull out the BCU for about 10 cm.
Full-capacity cabinet
Half-capacity cabinet
Half-capacity cabinet
scenario (7+7)
scenario (8+0)
scenario (7+0)
3
4
Remove the front cover of the battery
8+8 scenario (example)
module, install the battery baffle
plate, and tighten the two screws.
Check the insulation performance of
the battery module. Set a multimeter
to the DC voltage mode and measure
the voltage between the positive and
negative terminals of each battery
module and the screws on the
battery baffle plate respectively. If
the readings are less than 6 V DC,
the insulation is good. Otherwise,
contact technical support engineers.
Place the front covers
properly to prevent the
light pipes from falling off.
(1) Battery baffle plate (2) Negative terminal (3) Positive terminal
5
Install battery communications cables.
Communications cables for lithium batteries 1, 8, 9, and 16 have been installed
before delivery and are reserved near the lithium battery installation slots.
Full-capacity
Half-capacity
Full-capacity
Half-capacity
cabinet
cabinet
cabinet
cabinet
scenario (8+8)
scenario (8+0)
scenario (7+7)
scenario (7+0)
6
Install the filler panels.
In the 7+7, 8+0, and 7+0 scenarios, install filler panels in the vacant slots
for battery modules.
Full-capacity cabinet
Half-capacity cabinet
Half-capacity cabinet
scenario (7+7)
scenario (8+0)
scenario (7+0)

Advertisement

loading

This manual is also suitable for:

Smartli-512v-80ah-f-01Smartli-512v-80ah-s-01