Start-Up And Checkout - Crown Boiler BWC Series Installation Instructions Manual

Bwc series high effi ciency gas-fired hot water direct vent condensing boilers
Hide thumbs Also See for BWC Series:
Table of Contents

Advertisement

SAFE LIGHTING AND OTHER PERFORMANCE CRITERIA WERE MET WITH THE GAS TRAIN
ASSEMBLY PROVIDED ON THE BOILER WHEN THE BOILER UNDERWENT THE TEST
SPECIFIED IN Z21.13.
Use the following procedure for initial start-up of the boiler:
1) If not already done, flush the system to remove sediment, flux, and traces of boiler additives. This should be
done with the boiler isolated from the system.
2) Fill the boiler and hydronic system with water meeting the following requirements:
pH between 6.5 and 8.5
Total Solids less than 2500 PPM
Hardness less than 120 PPM (7 Grains/Gallon)
Pressurize the system to at least 12 psi at the boiler
IF ANTIFREEZE IS ADDED TO THE SYSTEM, USE ONE OF THE FOLLOWING
APPROVED PRODUCTS OR THEIR EQUIVALENT:
FERNOX ALPHI-11
GE-BETZ SENTINEL X500
NEVER ATTEMPT TO FILL A HOT EMPTY BOILER.
3) Check all new piping for leaks and purge piping sections that are filled with air. See the National Fuel Gas
Code for additional information on testing and purging gas lines.
NEVER USE A FLAME TO CHECK FOR GAS LEAKS.
MAKE SURE THAT THE AREA AROUND THE BOILER IS CLEAR AND FREE FROM
COMBUSTIBLE MATERIALS, GASOLINE AND OTHER FLAMMABLE VAPORS AND
LIQUIDS
4) Vent system must be complete and free of obstructions before attempting to fire boiler. Make sure that the
silicone cure time called for in the vent assembly instructions has passed before firing boiler.
5) Inspect all line voltage wiring for loose or uninsulated connections.
6) Remove the dust cap from the condensate trap (Fig 6.11). Add water to the trap until water runs out the con-
densate drain. Reinstall the dust cap.
X Start-up and Checkout
NOTE
WARNING
WARNING
38

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bwc150Bwc225

Table of Contents

Save PDF