Assembly Of Z-Flex Z-Vent Iii; Z-Vent Iii Connection To Vent Collar - Crown Boiler BWC Series Installation Instructions Manual

Bwc series high effi ciency gas-fired hot water direct vent condensing boilers
Hide thumbs Also See for BWC Series:
Table of Contents

Advertisement

3) Assembly of Z-Flex Z-Vent III:

a) General Notes:
Non-expanded ends of SVE Series III piping sections may be cut using aviation snips or a 24 thread
per inch hacksaw. File or sand the cut end smooth before assembling. Expanded ends may be cut to
adapt the SVE series III to the vent collar or Crown coaxial terminal. See the following instructions.
Support horizontal piping sections at intervals of 48" or less.
Vertical venting systems must be supported by at least one Z-Flex fire stop. An additional vertical
support is required after any offset and as required by the Z-Vent III installation instructions.
b) Start assembly of the vent system at the boiler. Remove the hose clamp shipped on the BWC vent collar.
Bend the three hose clamp tabs on this collar outward slightly.
c) Clean the exterior of the male end of the first piece of pipe and the inside of the vent collar on the boiler.
Remove dirt, grease, and moisture from the surfaces to be sealed. Dry surfaces or allow to dry thoroughly.
d) On the male end of the pipe, apply a ¼" wide bead of high temperature silicone approximately ½ inch from
the male end of the pipe. Apply ¼" beads of silicone along both sides of the longitudinal seam (Fig. 6.8).
e) Insert the male end of the pipe into the boiler vent collar until it bottoms out.
f)
Apply an additional bead of silicone over the outside of the joint and smooth out.
g) Replace and tighten the clamp on the vent collar.
h) The female end of each Z-Vent III component has a silicone sealing gasket. Examine all vent components
to insure that the gasket integrity has remained during shipping. Gaskets must be in the proper position or
flue gas could leak resulting in carbon monoxide poisoning.
i)
Align the second piece of pipe with the first and push them together as far as they will go, but not less
than 1-3/4".
j)
Tighten gear clamp to a minimum torque of 40 in-lbs and a maximum of 50 in-lbs.
k) Repeat Steps (h) – (j) for the remaining Z-Vent III components.
l)
In horizontal vent systems, a locking band or gear clamp must be used at either side of the wall penetration
to prevent shifting of the vent system in and out of the wall. This applies to both combustible and non-
combustible walls.
n) Allow the silicone to cure per the silicone manufacturer's instructions before operating the boiler.
FIGURE 6.8: Z-VENT III CONNECTION TO VENT COLLAR
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bwc150Bwc225

Table of Contents

Save PDF